Re-control Status Change
This function is used to assign a re-control (status Q) to a stock so as to renew it or reject it (status R).
Prerequisite
Refer to documentation Implementation
Screen management
Entry screen
The function is used to select lots on a given reference date in field "Lot re-control on".
Once the lots to be processed have been selected, the system presents in a grid all the statuses and sub-statuses existing for the selected lots and displays opposite the available replacement statuses and sub-statuses. A "Q status" and an "R status" are applied to lots with an "A status".
Lots with status A1 change to status Q1 and R1, etc. The destination statuses of this grid can be manually modified in order to replace status "Q*" and/or "R*" by the desired sub-status(es).
At process end, the system generates a list summarizing:
- the lots concerned by the status change,
- the journal numbers for the notes concerned by the status change,
- and the journal numbers of the demanded quality controls.
Block number 1
Site (field STOFCY) |
Enter or select the storage site where the selected product is active. The Selection icon (magnifying glass) only suggests products that are referenced in the products-sites table. |
Allocation date
Block number 2
Recontrol batches on (field REFDAT) |
Reference date used as a selection criterion in the lots status change. If nothing is entered, the current date is used. |
Block number 4
A single product by document (field DOCITMFLG) |
When a lot has expired, a status change document line is generated. This tick box is used to indicate whether it is necessary to create a single status change document by product (ticked) or several products can appear on this document (not ticked). |
Simulation (field SIMFLG) |
|