Work center/Capacity variation
This function is used to perform for a given work center the mass modification of the number of work center resources used by the WO operations.
This function can be accessed from the entry into the mass modification menu of the production technical data, but also from the update of a work center, in order to immediately pass the modifications in the general number of work center resources, or on the occasion of the introduction of a specific capacity variation, on all or part of the operations using this work center.
Prerequisite
Refer to documentation Implementation
Screen management
The function submits a selection screen, used to launch the search of the operations to be processed.
Selection criteria
Production site (field MFGFCY) |
The production site associated with the user is proposed by default. It can be modified by another site authorized for the operator, depending on its authorizations. |
Work center (field EXTWST) |
The work center is attached to a work center group. It corresponds to a production resource on which a routing operation is carried out. This is an entity for which it is requested to plan loads and track production times. Each work center is associated with an attachment site. |
Start date (field STRDAT) |
This field identifies the 1st day of the period for which the distribution key is defined. |
End date (field ENDDAT) |
This field identifies the last day of the period for which the distribution key is defined. |
Suggested work order (field OWS) |
Filter on the load type. |
Work order planned (field OWP) |
Work order firm (field OWF) |
Selection formula (field FORMULE) |
Enter, select or build an Enterprise Management filter calculation expression using the formula editor.
|
No. of resources (field VARWSTNBR) |
The number of work centers makes it possible to manage the number of resources for identical resources in order to carry out an operation. For instance, a labor work center may comprise 3 people. This is indicated by entering 3 in the number of resources. |
Entry screen
The different selection criteria are:
- the site,
- the work center,
- a search horizon,
- the status of WOs to filter,
- the number of work center resources requested for the operations to search.
When direct access it required to the function, each single selection criterion must be entered. If the function is activated from the Work Center update, some criteria are already entered: the work center, possibly the horizon (if access is possible via right click from a work center capacity variation).
Once the filters are entered, activating the [OK] button submits a table gathering all the selected operations (OWx WIP).
It will then be possible for each operation to modify the number of principal and secondary work center resources requested by the operation. In case of modification, the operation is automatically checked.
The validation of this screen via the [Save] button causes the checked operations to be updated, and the orders concerned to be re-scheduled.
It is possible to check an operation without modifying the number of work center resources, simply to indicate that the corresponding WO should be rescheduled.
The [Abort] button is used to reinitialize the table of the operations to be processed from the selection criteria, by cancelling all the manual modifications performed prior to validation.
Block number 1
Production site (field MFGFCY) |
The production site associated with the user is proposed by default. It can be modified by another site authorized for the operator, depending on its authorizations. |
field FCYDES |
Work center (field EXTWST) |
The planned work center is attached to a work center group. It corresponds to a production resource on which a routing operation is to be carried out. |
field FMODIF |
Box checked: Update of the operation corresponding to the line, if the number of lines has been modified and the re-scheduling of the WO. |
Order type (field TYPORD) |
Entry (field MFGNUM) |
This field displays the work order number (unique ID). |
Operation (field OPENUM) |
This field displays the sequence number of this operation. The operations in a routing used for manufacturing a product are assigned operation numbers. Each operation number corresponds to a task carried out on a given resource, with given times. |
Start date (field OPESTR) |
The subcontract operation start date is determined by default as follows: This field is managed depending on the setup of the entry transaction of the subcontract order. |
End date (field OPEEND) |
By default the subcontract service end date cannot be entered. It is automatically assigned with the receipt date of the released product. |
No. of resources (field EXTWSTNBR) |
The number of work centers makes it possible to manage the number of resources for identical resources in order to carry out an operation. For instance, a labor work center may comprise 3 people. This is indicated by entering 3 in the number of resources. |
No. labor facilities (field EXTLABNBR) |
This is the number of resources of the labor work center. |
Setup time (field SETTIM) |
The setting time is a fixed amount of time necessary to prepare the work center. It is part of the work center load. It is expressed in the time unit specified:
|
Run time (field OPETIM) |
The operation time is the time necessary to manufacture the product described in the routing. The operating time unit can be:
|
Operation UOM (field OPEUOM) |
Work order operation quantities are expressed in the operation unit. Use this operation unit to express operating time in a different unit to that of the product being produced by the routing. For example, a product managed by unit is subject to three different operations, none of which produce intermediate stock:
There is no need to create semi-finished products for each production phase. The operation unit is associated with a conversion coefficient for the stock unit of the product being produced by the routing and the operation unit. |
Quantity (field QTY) |
It is the allocated quantity expressed in UOM unit. |
Specific Buttons
Include |
The [Include] button is used to check all the operations of the selection. |
Exclude |
The [Exclude] button is used to uncheck all the operations of the selection. |
Error messages
In addition to the generic error messages, the following messages can appear during the entry :
"The end range is less than the start range"
Selection control error message by range.
"At least one work center resource is necessary"
At least one work center resource is needed to carry out the operation.
"Impossible to uncheck the box: the number of resources/Labor resources has been modified"
In order to be able to uncheck a line, the number of work center resources/Labor work center resources must have retrieved their initial values.