WIP finalization
Use this function to determine the production cost price (PCP) for a work order. You can also use it to obtain the variance between the actual cost and the standard cost (cost based on the data in the BOM), or the cost based on the work order data.
The work order must be closed if this function is being run in simulation mode.
The PCP calculation can be carried out on a single work order, or if an expression filter has been defined in the Work order header (MFGHEAD) and WIP valuation header (MFGWIP) tables, mutiple work orders.
The PCP calculation is based on the WIPCOST table from the production tracking. It can create the standard cost variance records, the adjustment and the WIP balance.
You can request a printout at the end of the calculation.
Inquiries are available to view the cost price history for a product and to compare the PCP with respect to other cost types for the defined site or a different site.
Prerequisites
Refer to documentation Implementation
Screen management
The WIP finalization function displays an initial screen into which you enter your selection (or filtering) criteria.
Entry screen
Selection
Simulation (field SIMFLG) |
Cost calculation (field PRF1) |
When this box is checked, the Work Orders whose PC was never calculated are/can be selected. |
Cost update (field PRF2) |
Click this check box to update the product costs for the selected work order. This field is only available in update mode, that is the Simulation check box is clear. You can recalculate and update the product costs as required, for example, after a subcontract invoice has been posted against a work order with subcontract operations. |
Site (field STOFCY) |
Production site This is initialized by default with the normal production site for the user. |
Order no. (field VCRNUM) |
This field is used to enter or select via tunnel a Work Order. |
Report
Printing (field PRNCOD) |
The printing options for the production cost are the following:
|
Exp. prorata to comp. (field FLXBUD) |
The flexible budget flag is used to correct the calculation database planned with respect to the Planned/Actual ratio. |
Variance source (field ORIDEVCLC) |
This field is used to specify the calculation basis for the planned production cost:
|
Print expected cost (field PRVCSTPRT) |
Print of non-achieved planned (field EDIPRV) |
Work order |
Click Work order from the Actions icon to select a specific work order. |
WO (Work order) filter |
Click WO filter from the Actions icon to select multiple work orders. You can filter the work orders by table and field. The tables applicable to this function are the Work order header (MFGHEAD) and WIP valuation header (MFGWIP) tables. |