Hourly constraints
This function is used to define the execution define time constraints for batch tasks, to define when a task can be launched.
Warning, this table is common to all the folders, because it is installed in the supervisor folder (this is normal given that the batch server functions for all the folders).
In order to understand the influence of the different parameters, it is advisable to read the documentation explaining the Function cycle for the batch server.
Prerequisite
Refer to documentation Implementation
Screen management
Entry screen
A date constraint code can be associated with a batch task or a group of tasks, in order to define the days that are authorised for its launch.
It is defined in two grids containing the authorised time ranges :
- one for the non working days (days of the week not ticked and days from the holiday calendar)
- the other for the working days.
Block number 1
Constraint (field COD) |
This code is used to identify a time constraint that can be assigned to a task or group of tasks. |
Description (field DES) |
Title associated with the previous code. |
Work days
field DAYOPE |
These check boxes define the days in the week that are worked. |
Other days calendar
Calendar (field CAL) |
This code is used to define the holiday days that are added to the non checked boxes in the record to define all the non working days. |
Grid Hours/day worked
Start time (field STROPE) |
These fields are used to define the time slots authorized for working days. |
End time (field ENDOPE) |
Grid Hours (worked) other days
Start time (field STRCLO) |
These fields are used to define the time slots authorized for non working days. |
End time (field ENDCLO) |