BOM codes
Use this function to define multiple bills of material (BOMs) for a product. The product reference and the BOM code provide the BOM reference.
You can define codes for sales BOMs, production BOMs, and for subcontracted BOMs. You can use the same code for different BOM types. You can further filter production and subcontract BOM codes by assigning the code to a specific site and a specific area of functionality:
- For manufacturing (production BOMs only)
- In cost calculations
- In Material Requirements Planning (MRP) calculations
- In the Master Production Schedule (MPS) calculations
Prerequisites
Refer to documentation Implementation
Screen management
The BOM code function contains a single entry screen.
Entry screen
Block number 1
Block number 2
| Access Code (ACSCOD) |
|
The code that restricts user access to the function. When populated, the access code needs to be defined on each users function profile to access the function. |
| Site (FCY) |
|
The production site. You can only assign a production site to manufacturing and subcontracting BOM types. Leave blank if the BOM code can be used at all production sites. |
Use
Error messages
In addition to the generic error messages, the following messages can appear during the entry:
Code already exists on line N.The selected BOM type plus BOM code combination already exists. You need to change the BOM code.
File: Key deletion impossibleThe BOM code has been assigned to a bill of material. You cannot delete the BOM code.
Modification impossibleYou cannot change the BOM type.
Tables used
Refer to documentation Implementation