This function is used to value the production WIP for one or more Work Orders (WO) or Subcontract Orders.

The production WIP corresponds to the value of the products in production for which the raw material has been consumed, time has been entered, and stock receipts have been carried out.
The WIP value is determined by the consumed value and the receipt value, where:

  • the consumed value represents:
    • the value of the material and semi-finished product consumed,
    • the value of the hours consumed (machine hours, labour hours),
    • the value of sub-contract receipts,
    • the value of the overheads,
  • the receipt value represents the value of the finished products booked to stock.

Note There is no backup file of the WIP value. A report can be printed at the end of the processing.

Prerequisite

See also Refer to documentation Implementation

Screen management

An intermediate screen is used to enter the selection criteria prior to the WIP valuation.

Entry screen

Error messages

In addition to the generic error messages, the following messages can appear during the entry :

Site incorrect

This message appears following the control on the WO number if the site of the WO is not the one entered.

This order has not yet been the object of reporting

This message appears following the control on the WO number if the reporting flag is set to "Printed" or "In design".

This works order is closed

This message appears following the control on the WO number if the status flag for this order is set to "Closed".

The production cost has already been calculated for this order

This message appears following the control on the WO number if the status flag for this order is set to "Prod cost calculated".

provisional Product cost records exist already

This message appears after modification of the WO number if records exist for the non updated provisional calculation of the product cost (MFGCOSTW) (information purposes).

After the process, the log file can contain the following messages :

Operation... the secondary work centre is not the one planned ...

This message appears if the secondary labour work centre indicated in the operation tracking is different to the planned secondary work centre. The secondary work centre does not appear in the report.

No valuation section for this work centre ...

This message appears if the Costing dimensions of a work center is empty.

Tables used