Calculate Sb-cont Expected Cost - Implementation
Prerequisite
Activity codes
The following activity codes (sorted by type) may have an impact on the way the function operates :
NMI : Number product lines
NMM : Number material lines
NMW : Number operation lines
General parameters
The following general parameters may change the way the function is working :
Purchase
CSTEORORD (defined at level Folder) : EO provisional receipt cost
OVECOLSCO (defined at level Site) : PC calc overhead column
VLTSCEOEXT (defined at level Site) : Service val price/planned PC
Common Data
VLTMATEXT (defined at level Site) : Mat. cost for WO expected
VLTSEMEXT (defined at level Site) : Manuf. cost for WO expected
Authorizations
An authorization can be granted for this function to limit the processes to a company or a site.