Number material lines
This activity code is used to determine the number of component lines on the cost calculation screen (standard costs, production costs, sub-contracting costs).
Recommended values
To determine the value, you must multiply the value of the MFM activity code (or the PSM activity code, if higher) by the maximum number of tracking that should be performed for each component.
For instance:
If max(MFM,PSM) = 50 and we consider that the maximum number of tracking per component will be 20, we must then enter the value 1000 (50*20)
Functions concerned
The following functions are impacted by the activity code :
Costing > Cost calculations > Standard cost calculation
Costing > Production costs > Calculate expected cost
Costing > Subcontract costs > Calc. expected subcon. cost
Costing > Production costs > WIP finalization
Costing > Subcontract costs > Calculate actual subcon. cost