Prerequisites

The selected site must be defined as a production site.

You must define the parameters that control the production scheduling process for the selected site.

General parameters

The following general parameters may change the way the function is working :

Manufacturing

  RELSTRDAT (defined at level Site) : Level on WO start date change

Authorizations

An authorization can be granted for this function to limit the processes to a company or a site.

Tables used

The following tables are implemented by the function :

Table

Table description

MFGHEAD [MFG]

Work order - header