Provisional Cost Inquiry - Implementation
Prerequisite
Activity codes
The following activity codes (sorted by type) may have an impact on the way the function operates :
Dependent activity codes
These codes are never entered in folder management, because their value is calculated :
DEBR (Intrastat state/region).
Functional
CFG : Configurator
DEB : EU exchange declaration
ECC : Product version management
FAS : Asset folder
FOA : Food allergens
LPN : Internal container management
LTA : Local taxing
MWM : Weighing stations
NPI : Product design
PJM : Project management
PLM : PLM - X3 interface
RVM : Routing version management
SAFT : SAF-T
SPD : Stock cost breakdown
WRH : Warehouse management
Sizing
ANA : No. of analytical dimensions
LAB : Number of labor groups
MAC : Number of machine groups
MAT : Number of material groups
NDL : Default no. of locations
NUC : Number of packing units
STI : Product statistical groups
Localization
KDE : German localization
KPO : Portuguese Localization
KUS : Localization USA
Authorizations
This function is object managed. The creation, modification, and deletion operations can be activated or deactivated for a given user. Filters by roles can also be associated with this function.
As data is linked to a site, a filter per site can be activated.
Note: access to this function is only authorized in inquiry mode.
Other prerequisites
Local menus
The following parameterizable local menus are used by the function. Their content must be updated if necessary :
Local menu number 316 : Dimension Cost Group
Local menu number 325 : Material Cost Group