This parameter is used in the automatic allocation function.

This function proposes the mass allocation of the materials linked to the production for a given site, a given period and a selection of a work orders.

The allocation is carried out for a date range: the user must specify up to what requirement date they wish to allocate the material. The "requirement date up to" is initialized thanks to the ALLHOR parameter in the following way:

Requirement date up to = current date + ALLHOR

Level of localization / Global variable

This parameter is defined at the level Site. It belongs to Chapter GPA (Manufacturing) and the Group MIS (Miscellaneous), The following parameters are also associated with this chapter and group :

The global variable GALLHOR is associated with it.

Functions concerned

Automatic allocation function FUNMAUTA.

Comments