Planning Regeneration
This parameter is used to manage the regeneration of the planned quantities when decreasing the quantity of a firm Work Order (WOF) arising from a planned Work Order (WOP) or when deleting this firm Work Order.
The regeneration consists in increasing the quantity of the corresponding WOP(s), if they still exist, or in recreating the corresponding WOP(s) if they no longer exist.
The possible values are:
Manual regeneration: a message proposes to the user to regenerate the planned quantities.
Automatic regeneration: the planned quantities are always regenerated.
No: the planned quantities are never regenerated.
Level of localization / Global variable
This parameter is defined at the level Site. It belongs to Chapter GPA (Manufacturing) and the Group MIS (Miscellaneous), The following parameters are also associated with this chapter and group :
- ALLHOR (Allocation horizon)
- LOTMGT (Lot management)
- OPEEFFAPP (Efficiency application )
- PLMMAXFIL (Max no. of elements to process)
- SFTTANDA (Time)
- STRCLEMOD (Sub contract close method)
- WSTEFFINH (Work center efficiency history)
The global variable GREGENPLN is associated with it.
Functions concerned
The following functions are associated with this parameter :
Manufacturing > Utilities > Pegging history
Manufacturing > Planning > Work order
This parameter is used in the Work Order management, Enterprise Workbench and Product Workbench functions.