Technical Sheet
This report describes all the checks to be performed on a released product at the level of an operation.
It describes the questions asked for each operation.
According to the parameterization, this document is included into the production folder.
(see the Parameterization of the Work Order Management Transactions documentation)
Prerequisite
Access to the report
This report can be accessed from the report menu of the group Manufacturing - Work order documents.
It is also called by default from the following functions :
Manufacturing > Planning > Work order
List of criteria
Parameter |
Parameter title |
Type |
---|---|---|
mfgfcydeb |
Plant range |
|
mfgnumdeb |
Work order range |
VCR |
pjtdeb |
Project range |
A |
gammedeb |
Routing range |
|
strdatdeb |
Start date range |
D |
codimp |
Print code (Local menu Print, Reprint) |
|
impselection |
Print selections (Local menu No, Yes) |