Use this function to recalculate the amount of work to be performed by a resource at a specific production site.
You can recalculate workload from a specific date for one or a range of work centers. Load allocated to the work centers is determined by the routing and the operations that are to be performed. The degree of load is determined by the quantity of the product required. This is defined by the work orders. This function will rebuild (resynchronize) the load buckets for all work orders according to the period breakdown (days, weeks and months) defined in the scheduling parameters.
Access to this process is also available from the Work centers (GESMWS) function.
You are advised to run this function on a regular basis and especially after any modification to a work center.
Refer to documentation Implementation
The Recalculate loads function displays an initial screen into which you enter your selection (or filtering) criteria. The load buckets will be built from the reference date you provide.
You are advised to run this function on a regular basis and especially after any modification to a work center.
Presentation
For a specified production site, the system selects all work orders that meet the following criteria:
Entry of a range of work centers is optional. All orders meeting the criteria above are processed, whatever their status (suggested, planned or firm).
The recalculation run automatically deschedules the selected work orders, reinitializes the load table (rebuilds the load buckets and work center capacity), then reschedules the orders.
Close
Fields
The following fields are present on this tab :
Block number 1
|
The production site associated with the user is proposed by default. It can be modified by another site authorized for the operator, depending on their authorizations. |
|
Reference date of the processing. |
Start - end range
|
The work center is attached to a work center group. It corresponds to a production resource on which a routing operation is carried out. This is an entity for which it is requested to plan loads and track production times. Each work center is associated with an attachment site. |
|
  |
|
  |
Parameters
|
  |
|
Processing of scheduled works orders. YES/NO flag. |
|
Box checked: used to include the optimized WOs to the WO selection. Box not checked: used to exclude the optimized WOs from the WO selection. |
Close
This function can be run in batch mode. The standard task FUNMIWL is provided for that purpose.
In addition to the generic error messages, the following messages can appear during the entry :
Coherency check of the selection ranges.
This message appears at the end of the System log if a lock problem forbids the update.
Serious access problem in the database.
This message is displayed if the works orders could not be descheduled.
Serious access problem in the database.