The Shop floor tracking (SFT) workbench is the main access page for you to track your shop floor activity. This includes clock in and out (if required), going on breaks, recording labor setup and run times, production tracking, elapsed labor, and indirect tasks.
The SFT workbench can also track shop floor activities for Summary and Detailed teams. See Working as a team for more information.
Enter your Employee ID and Site to begin. If you have a default site, it appears when you enter your ID. Available actions and activities are based on your employee profile and your site.
After entering your Employee ID, you can click Defaults to modify your current default settings to filter results for activities. When you click Defaults from this page, you can update your Site, Work center group, and Work center.
If the site you are working on requires clocking in, you need to click Clock in/out to enable all available actions.
If the site does not require clocking in, all available actions are enabled when you enter your Employee ID.
Open activities gridYou can add activities to the grid using the following actions:
Actual labor – Add Setup and Run activities with specific start and stop times. (See Actual labor help.)
Break – Go on a manual break, which adds the break to the grid and stops all open activities. (See Break help.)
Indirect – Add exclusive and nonexclusive activities. (See Indirect help.)
For Run and Setup activities, you can see the related Work order status by clicking Work order status from the Actions icon menu at the beginning of the row.
If there is text for the work order or operation, a Text icon is displayed in the first or second column of the row. Click the icon to read the note.
Employee ID fieldEnter your employee ID.
Site fieldIf you have a default site, it appears when you enter your ID. Or you can enter or select a valid production site. You can change your default site on the Defaults page.
Clock in/out action
If the site you are working on requires clocking in, click Clock in/out to begin or end your shift. When you Clock in, the Clocked in field displays the date and time.
To clock out, click the Clock in/out action. All your Open activities automatically stop.
Refer to documentation Implementation
You can track activities for the team like a single employee using the Summary team Employee ID.
You make all entries in the SFT workbench and follow the same procedures as an individual. This also applies to Defaults, Breaks, Indirect labor, and Elapsed labor that behave as for an individual.
You can update the number of team members on the fly from the Adjust team page without stopping or starting activities. Updating the number of employees for an existing team does not affect unposted activities. All open summary team transactions close and reopen with the new summary team count.
You must clock in and clock out as an individual. You can work on team tasks and on tasks outside the team.
You can work on team tasks if you are:
If you clock in using the Detailed team ID
Presentation
Use these fields to create a new employee profile.
Close
Fields
The following fields are present on this tab :
Employee
|
Enter the Employee ID. For teams, enter the Employee ID for the team. Detailed teams: members must clock in individually. Summary teams: clock in is not required and depends on the Site. |
|
If you have a default site, it appears when you enter your ID. Or you can enter or select a valid production site. You can change your default site or the default site for a Detailed team on the Defaults page. Note: Changing the default site for a Detailed team on the Defaults page does not change the default site for team members. |
|
If your site requires you to clock in, this field displays the date and time you clocked in. If you are part of a Detailed team, you need to clock in individually. |
Grid Open activities
|
Select this check box to select the activity. You can select multiple activities. |
|
If there is text for this work order, a Text icon is displayed for this record. Click the icon to read the text. |
|
If there is text for this operation, a Text icon appears for this record. Click the icon to read the text. |
|
This field shows the activity type: Run, Setup, Break, etc. |
|
This field displays the document number for Work orders. For Indirect activities and Breaks, this field displays the Description for the code.
|
|
This field displays the operations number. |
|
This field displays the activity start date. |
|
This field displays the activity start time. |
|
This field displays the operation unit of measure (UOM). |
|
For Run activities, enter the quantity completed. |
|
For Run activities, enter the rejected quantity when the completed quantity is more than 0. You cannot enter a value greater than the quantity completed. |
|
Enter a rejection code to provide an explanation for the rejected quantity. |
|
Select the Closed check box to close an operation. For Run activities, complete the following fields as needed: For Detailed team activities, this is performed by the team lead under the team Employee ID.
When the planned quantity for an operation is complete, this check box is automatically selected. |
Close
Action icon
For Run and Setup activities, you can see the related Work order status by clicking Work order status from the Actions menu at the beginning of the row.
Close
|
The following fields are included on the window opened through this button : Block number 1
Criteria
Grid Activity
Close Click Actual labor to select and start activities on the Actual labor page. The tasks that display in the Activity grid are based on your selection in the Criteria section and that are available to you. When you modify any of the criteria below, the grid automatically updates. You can filter results by:
Select activities by selecting the check box in the first column for each line or by modifying a field for that line. An activity is automatically selected if you modify something about the operation, like the number of machines, primary work center, or labor center. Multitasking
Setup activities Click Setup start to start selected activities in the grid. The Actual labor page closes and you return to Shop floor tracking workbench. The Open Activities grid displays started activities. Run activities Click Run start to start selected activities in the grid. The Actual labor page closes and you return to Shop floor tracking workbench. The Open Activities grid displays started activities. If you select one or more Run tasks with an active Setup task, you are asked if you want to stop the setup to start the run activity.
When you return to the Shop floor tracking portal, your tasks are listed in the Open Activities grid. You can access the Defaults page to change your default Work center group and Work center. Select Cancel to deselect all lines without saving any other changes. |
|
The following fields are included on the window opened through this button : Grid
Close To go on a break, click Break and select the appropriate Break code from the list. Only Indirect references with the Category type Break are included in the list. A break is always an exclusive activity. For Detailed teams
|
|
The following fields are included on the window opened through this button : Grid
Close Click Indirect to add activities such as exclusive and nonexclusive activities not associated with a work order. Breaks or auto breaks are not included in the lookup. Select an Indirect reference from the grid and click OK. Note:
For Detailed teams
|
|
The following fields are included on the window opened through this button : Block number 1
Criteria
Grid Activity
Close Click Elapsed labor to enter the time to complete an activity and the quantity produced. This is only available for Setup and Run operations. Note: This button is only active if your supervisor activated this option in your profile. If you are part of a Detailed team, the team profile must have this option selected. You can enter your time directly in the grid, as well as information for Run tasks like Remaining and Completed quantities. The grid automatically refreshes when you modify any records in the grid. Be sure to click Save before leaving the Elapsed labor page to save your changes. You can also enter time by activity type: Click Indirect to record time for Indirect activities.
Click Break to record time for breaks.
|
|
The following fields are included on the window opened through this button :
Close On the Defaults page, you can modify your default Site, Work center group, and Work center. These defaults filter activities on the Actualand Elapsed labor pages. You cannot define a default Work center that does not belong to the assigned default Work center group. Note: On any of the labor pages, you cannot modify your default Site. You can only modify Work center group and Work center. |
Click Clear to clear your activities in the grid. |
If you are part of a Detailed team and that team as open activities, you can rejoin the team after you leave the team to go on break, indirect activity, or do another task on your own. |
In addition to the generic error messages, the following messages can appear during the entry :