This function is used to carry out mass completions and/or closings of Work Orders that have previously been selected. Only in-progress firm work orders, that is to say those having been the object of a production booking, can be completed/closed.
It is also used to automatically trigger the calculation of the PCP, following the WO closing.
Refer to documentation Implementation
Presentation
This function contains two screens:
Close
Fields
The following fields are present on this tab :
Block number 1
|
The production site associated with the user is proposed by default. It can be modified by another site authorized for the operator, depending on its authorizations. |
|
Select the type of processing that you wish to carry out. |
Start - end range
|
Start and end ranges used to select the WO to be processed. The selection list available via right click is filtered in order to offer only the firm and in progress WOs. |
|
  |
|
Start and end ranges used to select the products released for which the user wants to close and/or complete the production. |
  |
|
The selected work orders are those for which the entire period (start date/end date) is included in the period defined by the entered dates. |
|
  |
|
Start and end ranges used to select the WO projects that the user wants to close and/or complete. |
  |
|
Start and end ranges used to select the WO orders that the user wants to close and/or complete. |
|
  |
Filters
|
  |
|
Flag used to indicate that only closed production orders will be processed. |
Blocks
|
  |
|
This checkbox is used when a current WO has at least one operation which tracking status has the "pending" value.
|
|
  |
|
This checkbox is used when the current WO has at least one material where the production tracking status has the value "pending".
|
|
This checkbox is used when the current WO has at least one material where the production tracking status has the value "pending".
|
|
When activated, this checkbox is used to block the closure when the produced quantity is lower than the planned quantity. |
Allocations
|
  |
|
When this checkbox is activated, it is used to carry out a tracking of the following materials: At the time of completion and/or closure of a WO, if the production of the released product has started, it is possible to automatically back flush the consumption of the materials with the stock withdrawal code "post-consumption" in proportion to the quantity produced of the released product. |
|
When it is activated, this box is used to carry out an automatic tracking of the following operations: At the time of completion and/or closure of a WO, if the production of the released product has started, it is possible to automatically back flush the consumption of the operations in proportion to the quantity produced of the released product. |
|
Box checked: the production cost price is triggered following the WO closure. Box not checked: the production cost price is not triggered. |
Close
Action icon
This action opens the WO management function.
This action opens the WO tracking function.
Close
This action is only available when the Completion processing is selected at the Selection screen level. |
Click the Close action to close the selected work orders and calculate the cost of the finished products. This action is only available for selection if the following conditions are met:
|
Use this action to mass include the set of displayed orders in the processing |
Use this action to mass exclude the set of displayed orders from the processing. |