The following activity codes (sorted by type) may have an impact on the way the function operates :
These codes are never entered in folder management, because their value is calculated :
POPSN (Production Scheduler).
EMP :
Location management
POPS :
Production Scheduler
An authorization can be granted for this function to limit the processes to a company or a site.
The following tables are implemented by the function :
| Table |
Table description |
|---|---|
|
MFGOPE [MFO] |
Work order - operations |
|
ROUOPE [ROO] |
Routing - operations |
|
ROUOPESTD [ROT] |
|
|
SCHEDULING [SCH] |
Work order scheduling |
|
WORKSTATIO [MWS] |