Manufacturing >  Technical data >  Serial modifications >  Work centers >  Work Centers - Implementation  

Display all Hide all

Prerequisite

Activity codes

The following activity codes (sorted by type) may have an impact on the way the function operates :

Dependent activity codes

These codes are never entered in folder management, because their value is calculated :

  POPSN (Production Scheduler).

Functional

  EMP :  Location management

  POPS :  Production Scheduler

Authorizations

An authorization can be granted for this function to limit the processes to a company or a site.

Tables used

The following tables are implemented by the function :

Table

Table description

MFGOPE [MFO]

Work order - operations

ROUOPE [ROO]

Routing - operations

ROUOPESTD [ROT]

Standard operations

SCHEDULING [SCH]

Work order scheduling

WORKSTATIO [MWS]

Work centers