Production Cost Calculation
This function can be launched on a single WO or on a selection of WOs, using the filters.
It is used to calculate the various costs corresponding to the various stages of the WO in order to analyze the variances and the valuation choices in the production reporting.
These different costs are the following:
Provisional theoretical cost: This corresponds to the standard cost but calculated for the provisional production quantity. This cost is also included on the Production cost detail in the Planned column when the standard data is chosen as the Variance calculation source.
Provisional release cost: This is the planned cost with respect to the WO data. It is equivalent to what is included in the Production cost detail in the Planned column when the WO data is chosen as the Variance calculation source.
Provisional production costs: This cost is similar to the provisional release cost but is calculated using the actual quantity produced.
The theoretical planned costs and the planned release cost serve to value the production reporting (according to the general setup CSTRCPORD). They are calculated either on demand or automatically during the creation and/or modification of the WO (according to the CLCWOCAUT setup). The Provisional production cost can only be calculated for a completed WO.
A print-out can be requested at the end of the calculation (see the Production cost calculation detail report)
A certain number of inquiries are used to understand the production cost and provisional cost history for a product, to compare the production cost with respect to the other cost types for the site or another site (see theCost comparison , Production cost history, Production cost inquiry documentation).
Prerequisite
Refer to documentation Implementation
Screen management
This function is composed of a screen that is used to assign the selection criteria and the different calculation setups.
Entry screen
Selection criteria
It is necessary to specify a site, to indicate a filter criterion (closed or open WO), then indicate a works order.
A tunnel from the Works order field is used to make a selection of closed WOs or to access a selection following on from a filter.
Calculations
Cost type: In this section, the cost type that is to be calculated is specified.
Overhead column choice
By default, the choice displayed corresponds to the choice specified by the OVECOLMFC setup. The choice of column determines the type of overhead cost used.
Update
Either update the cost calculated during the release or make a simple simulation.
Print choice
This setup is used to indicate the print type required at the end of processing.
None: No print-out will be released at the end of processing
Detailed: A print-out showing the most detailed level of the calculation will be printed
Summary: A print-out summarizing the calculation will be printed.
Selection criteria
Site (field STOFCY) |
Use this field to define the storage and/or production site. The site defined on the user record is displayed by default but can be amended.
|
Order close (field MFGTYP) |
The calculation of the Production Cost can be carried out for WO: |
Order no. (field VCRNUM) |
WO number or filter. It is possible:
|
Filter (field FILFLG) |
Calculations
Expected cost (field MFCTYP) |
Enter the cost type to be calculated. |
Printing (field PRNCOD) |
The printing options for the production cost are the following:
|
Overhead column (field SLTOVECOL) |
Use this field to define how overheads are valued. The default column is defined in the OVECOLxxx-xxx calc overhead column parameter (GPA chapter, COS group), where xxx corresponds to the type of cost calculation being performed (budget, standard, revised standard, simulation). You can change the default column, if required. The value of an overhead is calculated by applying the fixed rate or the formula in the chosen calculation column. |
Update (field MAJ) |
the update is only possible for cost prices of closed WOs. |