This function shows the history of the Production Cost Prices (PCP) for a given product and a given site.

Contextual functions are used to access the detail of each Production Cost Price calculation and the corresponding work order.

Only the updated PCPs can be viewed in the PCP history.

Prerequisite

SEEREFERTTO Refer to documentation Implementation

Screen management

This function uses a selection criteria screen, then cost inquiry screens.

The browser is used to select the product and the site which PCP history should be consulted.

Header

Sort

The sort can be carried out by:

  • actual quantity,
  • by date,
  • by work order,
  • by discrepancy percentage.

The discrepancy corresponds to the Actual qty/Planned qty ratio.
The sort can be performed in ascending or descending order.

Tab Total:

This tab shows all the calculated PCPs for the selected product and site, with for each PCP:

  • The total with Overheads,
  • the total without Overheads,
  • the Material part,
  • the machine part,
  • the labor part,
  • the sub-contract part,
  • the Overheads part.

Tab Graphic

This graphical representation displays the evolution of each production cost price.

Specific Buttons

Criteria

This button is used to access additional criteria in order to filter the types of costs to be displayed (Theoretical forecast, release forecast, Production forecast or Actual Cost Price).

Error messages

The only error messages are the generic ones.

Tables used

SEEREFERTTO Refer to documentation Implementation