This function is only available if CCN - Concession activity code is activated.

It is used to add revisions to the concession agreement.
A revision concerns mainly a modification of the end date of the contract thus reducing or extending the length of the concession.

It is a massive process because this modification has an impact on all the assets attached to the contract and requires a new calculation of their depreciation on the Accounting and Fiscal context, and if applicable, of their renewal provisions. An option can be used to launch this calculation at the end of the process.

In order to ensure the integrity of the information displayed in the assets attached to the contract, the assets are locked during the process. Nevertheless, the inquiry of assets is authorized.

SEEINFO This process can take a rather long time if the number of assets attached to the contract is important.

This action is authorized for contracts that have the status Active.
They are forbidden if there are at least one asset in the concession:
- which is part of an operation of renewal preparation,
- which purchase or issue date is beyond the concessions' new limits.

Prerequisite

SEEREFERTTO Refer to documentation Implementation

Screen management

Entry screen

This window is made up of a single screen that displays:

  • the process options which include the possibility to do a process simulation and to print a detailed log file at the end of the process.
  • The selection criteria for the contract on which the revision will be posted.
  • The process setups: the concession end date and the reason justifying its modification.

Description of the non-simulated process

Note: Launching the process with the Calculation option locks the company (no modification is possible) during the whole process.

This results in:

  • The contract is updated with the new concession end date and the revision is saved on the contract.
  • All non-issued accounting assets attached to the contract and with a revision are updated: the Effective Renewal Obligation flag might be updated according to the concession new end date (only if the asset is subject to a contract renewal obligation).
  • the amortization expense plan is updated according to the new end date.
  • If the calculation is required: calculation of all non-issued assets on Accounting and Fiscal context and calculation of the Provisions for the renewal of the assets for which the Effective renewal obligation has be modified.
  • If the calculation is not required: the concessions' non-issued assets are flagged To calculate on the Accounting and Fiscal context; assets which Effective obligation flag has been modified are also flagged Provision to calculate again.
  • the generation of a CCNREV - Revision of the concession contract event which bears the revision reason and contains a log file with the changes that have been made on the contract.
  • the generation of a log file with the process information: reference of the concession, execution setups, number of updated assets and the list of assets if the user wants a detailed log file.

Error messages

The only error messages are the generic ones.

Tables used

SEEREFERTTO Refer to documentation Implementation