Resource analysis report
Use this function to analyze production resource data generated by the Production analysis function. Efficiency and productivity data is provided in a report format for 1 or a range of work center groups and work centers operating at a single production site.
You can optionally generate new production output data from this function for resources tracked at a specific production site.
Previous analysis results are replaced with new analysis data if the analysis period is duplicated.
Prerequisites
Refer to documentation Implementation
Screen management
The Resource analysis report function contains a single screen into which you enter your selection criteria.
Entry screen
Enter the report criteria then select OK. The Enter report parameters screen displays. You can edit this screen as needed.
Selection criteria
Production site (field MFGFCY) |
Type in or select the work order production site. |
Analysis end date (field MSTDAT) |
Type in or select the period end date of the Production analysis report to analyze. The default end date is the last date of the period before the current period.
|
Analysis selection
Analysis to edit (field PROANA) |
Select the production output type to analyze: Resource use: To evaluate planned and tracked operating times. Resource yield: To evaluate planned and tracked production quantities. |
Block number 3
Refresh the analysis (field CLCANA) |
To analyze previous production analysis results, leave the checkbox clear. Select the checkbox to generate new analysis data on the efficiency or productivity of 1 or a range of work center groups or work centers operating at the selected production site. |
Analysis start date (field STRANA) |
If you selected the Refresh the analysis checkbox, type in or select the date to analyze production from. Otherwise leave blank.
|
Start - end range
Work center group (field WCRDEB) |
Filter for results within a range of work center groups operating at the selected production site. For a single work center group, enter the same work center group reference in the from/start Work center group and to/end fields. To report upon the efficiency or productivity of all work center groups, leave blank. |
field WCRFIN |
The last work center group reference in the range or leave blank. |
Work center (field WSTDEB) |
Filter for results within a range of work centers operating at the selected production site. For a single work center, enter the same work center reference in the from/start Work center and to/end fields. To report upon the efficiency or productivity of all work centers, leave blank. |
field WSTFIN |
The last work center reference in the range or leave blank. |
Error messages
In addition to the generic error messages, the following messages can appear during the entry :
Site name: Not a production siteYou have entered a site that is not a production site.
Mandatory fieldThe mandatory field is empty or contains an incorrect value.
Work center group (name of work center): Record does not existYou have entered a work center group that is not operational at the selected production site.
Tables used
Refer to documentation Implementation