WIP Cost Inquiry
This function is used to view the work order (WO) valuation situation and to compare the actual costs with respect to those that were planned at the time of release.
Prerequisite
Refer to documentation Implementation
Screen management
This function is made up of 8 tabs. The first two present a global view of the production cost for the works order. The other tabs are used to analyze in greater detail each cost category.
Header
This tab presents the general information for the Works order (WO) :
The site
The WO number
The tracking type (WO, product or miscellaneous)
The adjustment pro rata
The quantities (Planned, Actual, Rejects and remaining)
The dates (Start, End, First tracking and last tracking)
It should be noted that all the tracking types load the WIPCOST and MFGWIP tables. In this latter, for the production tracking by WO, there will be a record by order. In the case of miscellaneous type tracking, there will be a record by work center and by period. Finally, for the product type tracking, there will be a record by routing and by period for the operations and a record by period for the material tracking.
Block number 1
Order no. (field VCRNUM) |
Work order/sub-contract order numbers used to select a cost price. |
Site (field MFGFCY) |
The production site associated with the user is proposed by default. It can be modified by another site authorized for the operator, depending on its authorizations. |
Tracking flag (field MFGTRKFLG) |
field CUR |
Entry type (field VCRTYP) |
Tracking type (field TRKTYP) |
Valuation (field VLTCOD) |
Prorata adjust. (field PROPER) |
Quantities
Planned (field EXTQTY) |
Completed (field CPLQTY) |
Rejected (field SCRAP) |
Remaining (field RMNEXTQTY) |
Dates
Start date (field STRDAT) |
End date (field ENDDAT) |
First tracking (field TRKFIRST) |
Last tracking (field TRKLAST) |
Tab Accumulations
This tab displays all the accumulations for each cost type :
Material
Labor
Machine
Subcontracting
Overheads
Totals
Balance : this line is entered when the WO is closed.
"Actual cost" column
The "Actual cost" column displays what has been consumed for each cost type. The material costs are obtained by adding the actual value of the issue movement transactions. For the Subcontract cost, it is based on what has been invoiced and for the Labor and Machine, it is based on what has been calculated from the valuation dimensions.
"Standard cost" column
The "Standard cost" column displays the detail of what has been entered to stock. This receipt to stock can be carried out at standard price, revised standard price or order price (provisional standard cost or provisional release cost) according to the valuation method. All these costs are detailed by material, labor, machine..... and this detail is then stored in the production reporting records in the WIPCOST table. Therefore in the "Standard cost" column the sum of all these movements can be found.
"Rejects" column
Once the production cost calculation is carried out, the value of the rejects that have been declared is displayed in this column.
The calculation of the cost of the rejects declared for an operation is based on the cost of the operation and the components that are attached to it.
For example:
Data for the example
Operations |
||||
No. |
Unit |
Qty |
Rej Q |
Amount |
5 |
One |
20 |
1 |
400 |
10 |
Kg |
3 |
0,5 |
300 |
Components |
|||
Name |
Oper |
Qty |
Amount |
A1 |
0 |
3 |
150 |
A2 |
5 |
4 |
250 |
Intermediate grid
Oper no. |
%reject |
Amount |
Amnt A1 |
Amnt A2 |
5 |
5% |
400,00 € |
75 € |
250,00 € |
10 |
16,6% |
300,00 € |
75 € |
- € |
The amount for component A1, which is not attached to an operation, is distributed across all of them.
Oper no. |
Oper rej amnt |
Reject A1 |
Reject A2 |
Total |
5 |
20,00 € |
3,75 € |
12,50 € |
36,25 € |
10 |
113,33 € |
24,38 € |
39,58 € |
177,29 € |
The operation reject amount for operation 5 is 20: 5% * 400
The operation reject amount for operation 10 is 136: 16,6% * (400 + 300 - 20)
The A1 reject amount on operation 5 is 3.75: 5% * 75
The A1 reject amount on operation 10 is 24.38: 16,6% * (75+75 - 3,75)
The A2 reject amount on operation 5 is 12.5: 5% * 250
The A2 reject amount on operation 10 is 39.58: 16,6 * (250 - 12,5)
"Variance" column
The differences found between planned and actual are found in the "Variance" column.
Description (field DESCR) |
Actual (field ACTCST) |
Expected (field STDCST) |
Reject (field REJCST) |
Variance (field VARCST) |
Variance % (field VARPCT) |
Description (field DESCST) |
Actual cost (field AMTCSTREL) |
field AMTCSTTHE |
Description (field DESCSTCMP) |
Material (field AMTCSTMAT) |
Labor (field AMTCSTLAB) |
Machine (field AMTCSTMAC) |
Subcontract (field AMTCSTSCO) |
Overhead (field AMTCSTOVE) |
Total (field AMTCSTTOT) |
Tab Totals (acctg)
The Totals (acctg) tab contains the same lines and columns as the Accumulations tab. It presents the values that have been transferred to accounting for each cost type.
Grid
Description (field DESCR) |
Actual (field ACTCST) |
Expected (field STDCST) |
Reject (field REJCST) |
Variance (field VARCST) |
Variance % (field VARPCT) |
Tab Products
This tab presents the costs that have been declared in production. There is a line for each released product (that has been the object of a tracking record). For each of these there is:
The completed quantity
The actual amount as well as that transferred to accounting
The actual overheads as well as those transferred to accounting
The adjustment value
A right click on the line provides access to the "Product cost detail". This screen presents similar information but by detailing each tracking report. From this there is the possibility to zoom to the original tracking record or the accounting document that has been generated.
Grid
Order line (field VCRLIN) |
Product (field ITMREF) |
Major version (field ECCVALMAJ) |
Minor version (field ECCVALMIN) |
Unit (field STU) |
Quantity (field QUANTITY) |
Amount (field AMOUNT) |
Posted amt. (field AMTPOST) |
Product type (field ITMTYP) |
Adjustment (field CSTADJ) |
Overhead (field OVERHEAD) |
Posted expenses (field OVEPOST) |
Product cost detail |
Tab Materials
This tab displays the costs from the material tracking. There is a line by component (that has been the object of a tracking record). For each of these there is:
The completed quantity
The actual amount as well as that transferred to accounting
The actual overheads as well as those transferred to accounting
A right click on the line provides access to the "Material cost detail". This screen presents similar information but by detailing each tracking report. From this there is the possibility to zoom to the original tracking record or the accounting document that has been generated.
Grid
Order line (field VCRLIN) |
BOM sequence (field BOMSEQ) |
Product (field ITMREF) |
Major version (field ECCVALMAJ) |
Minor version (field ECCVALMIN) |
Unit (field STU) |
Quantity (field QUANTITY) |
Amount (field AMOUNT) |
Posted amt. (field AMTPOST) |
Overhead (field OVERHEAD) |
Posted expenses (field OVEPOST) |
Material cost detail |
Tab Labor
This tab presents the costs for the labor reporting. There is a line by operation (that has been the object of a tracking record). For each of them there is:
The completed quantity
The actual set-up and operation times
The actual amount as well as that transferred to accounting
The actual overheads as well as those transferred to accounting
Aright click on the line provides access to the "Labor cost detail". This screen presents similar information but by detailing each tracking report. From this there is the possibility to zoom to the original tracking record or the accounting document that has been generated.
Labor cost detail |
Tab Machine
This tab presents the machine tracking costs. There is a line by operation (that has been the object of a tracking record). For each of them there is:
The completed quantity
The actual set-up and operation times
The actual amount as well as that transferred to accounting
The actual overheads as well as those transferred to accounting
A right click on the line there provides access to the "Machine cost detail". This screen presents similar information but by detailing each tracking report. From this there is the possibility to zoom to the original tracking record or the accounting document that has been generated.
Machine cost detail |
Tab Subcontract
This tab presents the subcontract tracking costs. There is a line by operation (that has been the object of a tracking record). For each of them there is:
The actual quantity and the reject quantity
The actual set-up and operation times
The actual amount as well as that transferred to accounting
The actual overhead costs
A right click on the line provides access to the "Subcontract costs". This screen presents similar information but by detailing each tracking report. From this there is the possibility to zoom to the original tracking record or the accounting document that has been generated.
Grid
Op. (field OPENUM) |
Operation split (field OPESPLNUM) |
Unit (field STU) |
Quantity (field QUANTITY) |
Rejected qty. (field REJECTED) |
Setup time (field SETUP) |
Run time (field OPETIM) |
Amount (field AMOUNT) |
Overhead (field OVERHEAD) |
Posted amt. (field AMTPOST) |
Posted expenses (field OVEPOST) |
Subcontracted prod. (field SCOITMREF) |
Subcontract cost detail |
Tab Overhead Cost
This tab displays a summary of the overhead costs by nature. For each of theses there will be:
The material costs
The labor costs
The machine costs
The subcontract costs
Grid
Type (field OVENAT) |
Materials (field MATERIAL) |
Labor (field LABOR) |
Machine (field MACHINE) |
Subcontract (field SUBCONT) |
Reject (field SCRAP) |
Total (field TOTAL) |
field STANDARD |
field VARIANCE |