Overheads are used only in:

  • provisional costs (standard, revised standard, budget, simulated),
  • the Production Cost Price (PCP),
  • the valuation of some stock movements.

They can be posted on product codes and valuation dimensions.

They can be calculated by cascade or as a total and can be posted on receipt or on issue from stock. They are defined for all the folder.
An overhead code can be distributed over several cost natures (maximum 6). Example: administrative costs, maintenance costs etc.
For each overhead nature, it is possible to define a maximum of four formulas for the overhead calculation, in such a way that it is possible to differentiate between the cost calculation method by nature as a function of the calculated cost (standard, revised standard, budget, simulated, production cost).

Prerequisite

SEEREFERTTO Refer to documentation Implementation

Screen management

The overhead creation screen is comprised of a single tab.

Entry screen

Charge setups

This section is used to determine the calculation method and the overhead application method.

Error messages

The only error messages are the generic ones.

Tables used

SEEREFERTTO Refer to documentation Implementation