Prerequisites

Activity codes

The following activity codes (sorted by type) may have an impact on the way the function operates :

Functional

Bullet point  CAP :  Finite capacity

Bullet point  CCM :  Change control management

Bullet point  CFG :  Configurator

Bullet point  MWM :  Weighing stations

Bullet point  NPI :  Product design

Bullet point  RVM :  Routing version management

Bullet point  SMI :  Integrale migration

Sizing

Bullet point  MFO :  Number of operations

General parameters

The following general parameters may change the way the function is working :

Manufacturing

Bullet point  ROUSTE (defined at level Folder) : Operation sequence increment

Authorizations

This function is object managed. The creation, modification, and deletion operations can be activated or deactivated for a given user. Filters by roles can also be associated with this function.

As data is linked to a site, a filter per site can be activated.

A filter by access code is performed, based on the field named ACSCOD. If an acess code is given, the inquiry and modification rights are granted according to the reading and writing rights associated with the code of the current user in their function profile.

Miscellaneous prerequisites

The routing code must be an existing product code.

Other prerequisites are as follows:

  • Standard operations
  • Work centers
  • Units
  • Technical sheets
  • Tools

Tables used

The following tables are implemented by the function :

Table

Table description

ATABZON [ATZ]

Field dictionary

ATEXTRA [AXX]

Texts to translate

ITMFACILIT [ITF]

Products-sites

ITMMASTER [ITM]

Products

MFGHEAD [MFG]

Work order - header

ROUOPE [ROO]

Routing - operations

ROUOPESTD [ROT]

Standard operations

ROUSCD [ROS]

Routing - scheduling operation

ROUTING [ROH]

Routings - header

TABROUALT [TRO]

BOM routings

TABWRKCTR [TWC]

Work center groups

WORKSTATIO [MWS]

Work centers