Use this parameter to define which budgets should be controlled simultaneously. You can control up to 10 budgets. To simultaneously control more than one budget, you need to enter or select a budget code for each parameter from BUP1 up to BUP9.

Level of localization / Global variable

This parameter is defined at the level Site. It belongs to Chapter BUD (Budgeting) and the Group CMM (Budget control), The following parameters are also associated with this chapter and group :

Its values are defined by the function Budgets.

No global variable is associated with it.

Functions concerned

The following functions are associated with this parameter :

  Setup > Financials > Budgets > Budgets

  Purchasing > Purchase requests > Purchase requests