The revised standard cost is generally used in order to prepare the way for a new standard cost following the revaluation of a material, an hourly rate etc.

The revised standard costs created in the same year, for the same product and the same site are backed up and can be viewed using the Cost history function.

The revised standard cost calculation can be associated with an accounting interface, which makes it possible, during the update of a new revised standard cost, to re-evaluated the stock value of the semi-finished and finished products.
This function is used to calculate the revised standard cost of a product, a selection of products, all the products at a site from a cost type routing alternative, a cost type BOM alternative , with or without immediate update, to print a document summarizing or detailing the calculation.

The revised standard cost calculation uses the routing data (time) and the valuation dimension data for the work centers associated with the route during the processing.
When the calculation is carried out a raw material, the process makes an attempt to determine the receipt overheads for the material.

The user has several possibilities available for the calculation to establish a standard cost:

  • a choice of calculation quantities,
  • a choice of raw material valuation,
  • overheads,
  • the valuation dimension rates,
  • a posting method for the fixed costs.

For a calculation including the BOM multi-levels or for a calculation for several products, the process is exclusive by site, that is to say no other user can launch a cost calculation at the same site at the same time.
If the process is requested for a selection of products, the system examines these products in decreasing order of the codes at the lowest level.

The calculation with or without the lower BOM levels consists of reading the component costs at the first level and transferring them to the cost of the parent product.

  • When calculated with BOM split, the calculation includes the component costs at the first level, but also all components n decreasing order of the codes at the lowest level.
  • A calculation excluding the lower BOM is justified for an update when the costs of the sub-levels have already been calculated. 

Notes about the material and subcontract cost: :

  • Materials:
     
    By definition, material does not have component. The "Material cost selection" field is used to determine how its cost is calculated when defined as "calculated" and not "entered".
     
  • Subcontract:
     
    The search to value the sub-contract service in a context of production is as follows:
     
    1/ The reference price on the operation, if it exists, is taken into account.
    2/ The price of the valuation method is taken into account if valuation method is on the product-site.
    3/ Search of price list.
     
    The cost of materials given by a subcontract always comes from the price list; if the price list is not found, the standard cost can be used if the PURPRICE - Standard cost default price list parameter has the value Yes.
     
    To search the sub-contracting service (without WO) and the provided material list prices given by the subcontractor (and to search the material list price and the choice of BOM components), the calculation process is systematically based on the validity start date of the cost.

SEEWARNING If a product has a BOM, the production overhead is taken into account, otherwise the receipt overhead is taken into account.

Prerequisite

SEEREFERTTO Refer to documentation Implementation

Screen management

The Revised standard cost calculation calculation is presented in a single screen where the operator indicates the product selections and the calculation parameters.

Entry screen

Selection criteria

Site

The user must indicate the site for the calculation.

Selection of the products

The user must indicate either a product, or a group of products at the site or a selection of products.
When the choice is a single product, it is necessary to indicate the product reference, and to tick the box "unique".
To choose to calculate the standard cost for all the products at the site, tick the "All" box.
To carryout the revised standard cost calculation for a selection of products, it is necessary to create the selection filter via the contextual menu accessible in the Product field.
The filter can be saved.
At the end of the selection the "selection" button activates.

Validity

The user has to specify the validity period of the calculated revised standard cost.

Calculation quantity

This is the quantity that will be used in the calculation.
In the case of a calculation for a single product, this filed is loaded by default by the economic quantity for the product but can be modified.

Calculation parameters

BOM routings

The user must indicate an alternative routing of the cost type, this alternative must be associated with a BOM alternative that is also of the type cost.
In the case where the routing alternative is not entered, the process will only calculate the material costs.

BOM code

The BOM alternative is displayed and is non modifiable. This is the first BOM alternative associated with the routing alternative previously entered.
It is necessary to ensure that this BOM is of a cost type alternative.

Descent through the BOM

The "Descend BOM" field is only active in the case of a single product calculation.
If this flag is set, the process descend through the BOM to the lowest level or up to a parent product whose "Update Revised Standard Cost" code is entered (Cost tab in the product-site record).
The calculation processes and stores the revised standard cost for each parent product found.

If the flag is not positioned, the calculation is carried out at the first level, and it uses the existing costs of the components based on the material cost selected.

Distribution of the fixed costs

The fixed overheads (material loss, setup rate, operation loss rate, fixed rate) are distributed either as a totality or pro rata for the calculation quantity/economic quantity.

Material cost choice

The material cost choice is initialized by default (CLCCUTMAT setup), it is used to value the material cost.

Dimension rate choice

The dimension rate choice is initialized by default (CLCCUTRAT setup), it is used to value the labor and machine elements in the calculation.

OH column choice

The OH column choice (Overheads) is initialized by default (OVECOLCUT setup), it is used to value the overhead element in the calculation, detailed by the nature of the overhead and calculated by applying the fixed rate or the formula in the chosen calculation column.

Update code

The update code is used to :

  • Simulate a calculation (Choice 'no')
  • update the calculation in differed mode, this update is carried out by the "Update the calculated costs" function.
  • update immediately.
Printing the result of the calculation

At the end of the process, a log file can be printed, this file summarized all the products processed and any anomalies found.
A Crystal Report document can then be printed detailing and / or summarizing the calculation.
When a calculation does not include a descent through the BOM, the print is of a calculation summary.

Batch task

This function can be run in batch mode. The standard task CALCSTCUT is provided for that purpose.

Error messages

The only error messages are the generic ones.

Tables used

SEEREFERTTO Refer to documentation Implementation