Use this function to modify (or replace) operations in one or a range of routings at a specific site. 

You can set a validity start date for replacement operations. The default is today's date. Replacement operations are given the same sequence number in the routings as the operations being replaced. Their index number is incremented and the validity start date set. The operation with the highest index number is the new operation.

 This function does not 'delete' operations, it simply marks them as 'not valid' by setting the validity end date to the validity start date for the replacement operation minus 1 day (n-1).

 The routing displays operations that are valid on a specific date. The new operation, therefore, is only displayed in the routing once it becomes valid (fields Reference date (DATREF)/Start date (VALSTRDAT)).

 You cannot use this function to change work centers assigned to operations. Use the function Replace work-centers instead.

 

Prerequisites

SEEREFERTTO Refer to documentation Implementation

Screen management

The Routing operations function displays two selection screens:

  • An initial screen into which you enter your routing selection (or filtering) criteria;
  • A validation screen in which you confirm the updated or replacement details.

A log file displays the results of the run. Any excluded version-managed routings are listed on the log file.

Entry screen

Type in, or select the site at which the routings are to be updated.

If operations are to be replaced, click (select) the Replacement by date check box and select the effective application date. This will be used as the validity start date for reindexed operations.

Then select the routings to be included in the run. You can include subcontract operations and operations assembled into routings from standard operations. Only routings that are not version managed will be updated.

Start-end ranges

A number of ranges are displayed.

  • To update the operations in all applicable routings, leave all the fields as the default values or blank.
  • To update the operations in selected routings, type in the required ranges. Leave the first field blank to include the lowest value or the second field blank to include the highest value.

You can optionally select the routings by applying a calculation formula.

Modification block

You use the fields in the Modification block to update specific fields on the operations that are used in the selected routings.

Click (select) the required check box to update the field then enter the new value. Alternatively you can apply a calculation formula to change the field values.

Modification block (continued)

Tab Modification of operations

You use this tab to confirm the details of the operations to be updated in the routings listed. You can change selected details, if required.

To cancel the update of a specific routing operation, click Delete from the Actions icon.

A log file displays the results of the run. Where appropriate it includes information which should be noted or acted upon. It also lists any excluded version-managed routings.

 

Error messages

In addition to the generic error messages, the following messages can appear during the entry :

"End range is less than Start range"

The range you have selected is invalid.

"The number of resources is higher than the work center capacity"

This message is displayed if the number of resources entered exceeds the maximum number of available work centers (main or labor).

"Warning, it is necessary to verify that the times (setting, operation or rate) remain correct"

This warning is displayed if the operation unit (OPE) has been modified. When the units are changed you must check the coherence of the times already entered.

Version-managed routings included in the selection criteria are not processed. Update them manually.

Amendments to the operations in a versioned routing are tightly controlled to minimize the impact on work orders. The selected operation is in one or more version-managed routings. The list of routings displayed will not include version-managed routings as these are excluded from the replacement process.

"No coefficient found between Operation Unit (OU) and Stock Unit (STK) (XX=OU, YY=STK)"

This message is displayed if a conversion coefficient between the operation unit (OPE) and the stock unit (STK) has not been set up. A conversion coefficient of '1' has been applied (OPE/STK=1).

"Operation X/X/X. A replacement operation already exists"

This message means that for the defined operation there is already a replacement operation in the routing. The initial and replacement operations have the same operation number, but they have been given different indices to distinguish them.

"Modification of operation X/X/X"

This is an information message. Operations are modified when the modification run is confirmed.

"Creation of operation X/X/X"

This is an information message. Replacement operations are created when the modification run is confirmed.

Tables used

SEEREFERTTO Refer to documentation Implementation