Prerequisites

Other prerequisites

BOM codes assigned to production and subcontract BOMs (bills of materials) must specify that the code can be used for Material Requirements Planning (MRP) and/or in the calculation of the Master Production Schedule (MPS).

 BOM codes

Authorizations

This function is object managed. The creation, modification, and deletion operations can be activated or deactivated for a given user. Filters by roles can also be associated with this function.

As data is linked to a site, a filter per site can be activated.

Tables used

The following tables are implemented by the function :

Table

Table description

FACILITY [FCY]

Sites

PARMRP [PCB]

Requirements parameters

TABBOMALT [TBO]

BOM codes

TABROUALT [TRO]

BOM routings

TABWEEDIA [TWD]

Weekly structures