This function is used to create and modify the answers to the technical sheets within the framework of operation trackings created previously.
Refer to documentation Implementation
The technical sheet plan screen can be customized with the transaction setup.
Result display
In both cases, the information of the technical sheet plan is managed in a header and a grid.
When a transaction is selected, the tracking and technical sheet management is performed with a right click on the line.
Presentation
This tab is used to enter the selection criteria for the operation trackings to be displayed.
Close
Fields
The following fields are present on this tab :
Filters
|
It is for this site that the tracking is carried out. |
|
This field corresponds to the Labor operator. |
|
  |
|
This field is used to select the operation trackings whose creation date is included in the date range that is being searched. |
|
  |
Start - end range
|
This field is used to filter the search by production tracking number. |
|
  |
|
This field is used to filter the operation tracking lines based on their operation numbers. |
|
  |
|
This field is used to filter the operation tracking lines based on the work center. |
|
  |
|
The WO tracking is identified by this unique number. |
|
This field can take the following values:
|
|
This field displays the work order number (unique ID). |
|
This field indicates the product reference code. It is generated by a sequence number counter (set up in function Sequence number counters) in the case when the product category has a sequence number counter code. The reference cannot be modified. It is automatically assigned and displayed when the product creation is complete. |
|
Multiple routings can be defined for a single product. Each routing code can be assigned specific management features. These include restriction of the routing to a specific site and to specific areas of functionality (for use in a manufacturing environment, for costing or for capacity planning). |
|
This field indicates the technical sheet name. |
|
The production routing is described by means of operation numbers. |
|
The field corresponds to the operation fraction number. |
|
The standard operation is a "template" operation used to create or modify the routing operations. Recover the standard operation data:
|
|
The type of a work center can be either machine, labor or sub-contracting. |
|
This field indicates the actual work center. |
|
This field specifies the "short" description of the work center. |
|
A labor work center can be associated with the machine-type principal work center. The labor work center times are calculated using two coefficients:
|
|
The operation unit expresses the operating time in another unit than that of the product described by the routing. Example :
This unit is associated with a conversion coefficient for the stock unit of the product for which the routing has been set up and the operation unit. The quantities of the work order operations are expressed in the operation unit. |
|
  |
|
This is the planned setting time to obtain the setting time allocated to the labor work center linked to the main work center. This coefficient applied to the planned setting time to obtain the setting time allocated to the labor work center linked to the main work center. |
|
  |
|
This field indicates the expected quantity for this tracking product. |
|
This is the coefficient applied to the planned operation time. It is used to obtain the operation time for the labor work center linked to the principal work center. This field is only available for entry if the labor work center is defined. Operation times are subdivided as follows: Proportional times are expressed for the production of an operation unit (and not in the stock unit of the finished product using the routing). |
|
This field displays the total completed quantity, including the rejected quantity, expressed in the operation unit. |
|
This field displays the actual rejected quantity.
|
|
The time unit defines how time for the operations in this routing is expressed. The time unit can be 'hours' or 'minutes'. It applies to the setup time, run time and the rate of all operations in the routing. |
|
The unitary time is the actual operation time necessary for the production of a unit. |
|
The setting time is a fixed amount of time necessary to prepare the work center. |
|
This is the actual setting time. |
|
The operation time is the time necessary to manufacture the product described in the routing. The operating time:
|
|
This is the actual operation time. The operating time:
|
|
Use this field to specify whether the line must be closed or not ('Yes'/'No'). |
|
This field corresponds to the Labor operator. |
|
This field displays the information message linked to the operation tracking. |
|
It is the information message concerning the rejected quantity. |
|
Scheduling determines the way in which routing operations follow each other. It can take the following values:
|
|
The next operation is used to link the routing operation in a logical progress order describing the operating process. The next operation must be different from the processed operation, and must be part of the operations of the processed routing. |
|
  |
|
  |
|
This field defines the type of production tracking that applies to this operation, as follows:
|
Close
Action icon
Access to the management function of the production tracking in the operation tracking line that is selected in the grid.
Access to the technical sheet entry in the operation tracking line selected in the grid.
The technical sheet is used to enter or modify the answers to the questions.
Close
By default, the following reports are associated with this function :
FICTECASW : Technical sheet answers
This can be changed using a different setup.
|
The following fields are included on the window opened through this button : Close This button is used to load the grid as a function of the criteria selected in the header. |
|
The following fields are included on the window opened through this button : Selection criteria
Start - end range
Sort
Close This button is used to:
|