Receipt lines
Use this function to display goods lines received against purchase orders at one or all sites on one, or between a range of dates.
You can inquire by company, site and product, from one or a range of suppliers and receipt numbers, and for one or a range of projects. You can filter the results by the status of the receipt.
Prerequisite
Refer to documentation Implementation
Screen management
This function is customized to the needs of your organization and your processes. The Inquiry screens function for code 'CPS' determines the way in which you enter information, and how information is displayed and printed.
The Receipt lines inquiry function contains a section for you to enter your selection criteria and a table (grid) in which the results of the search are displayed.
Header
Selection
Use this section to filter or select purchase receipts:
- Start date. The default Start date is the first date of the month two months before the current month but can be amended.
- End date. The default End date is the last date of the current month but can be amended.
The search, therefore, covers a 3 month period, by default.
Status
You can filter the results by the status of the receipt using the Status section.
You can use the Criteria action to enhance the selection criteria applied.
Selection
Company (field CPY) |
This field is used to specify the company code. |
Receiving site (field PRHFCY) |
Ce champ permet de renseigner le site de stockage. |
From supplier (field BPSNUMDEB) |
To supplier (field BPSNUMFIN) |
From receipt no. (field PTHNUMDEB) |
Ces champs sont facultatifs. Ils permettent de saisir ou sélectionner une fourchette de réceptions à afficher.
|
From project (field PJTDEB) |
Use these fields to filter for results within a range of project codes. For a single project, enter the same project code in the From/start project and To/end project fields. The content can be one of the following:
If the content of this field includes a character such as an exclamation mark "!" this field links to the structure of the project. The character is the separator between a project code and the structure, either the project cost structure or the project operational structure. For example, if a material task code is 'USA-P3' and a project code is 'USA12345678', this field displays a link to the project operational structure as 'USA12345678!USA-P3'. To provide a quick and easy visual reference the link to the project or project structure is distinguishable by the number of separator characters used. If there is no separator, the link is made to the project. A single separator character such as an exclamation mark after the project code (the first code) indicates the link type is a task (the link is to the project operational structure). Two separators placed after the project code mean that the link corresponds to a budget code (link to the project budget structure).
|
To project (field PJTFIN) |
Whole project (field PJTDSPALL) |
Select this check box to view all records linked to the selected projects. To only view records linked to the selected structure of the projects, leave this check box clear. If the value of the From/To project field includes a character such as an exclamation mark "!" the search includes the structure of the project. The character is the separator between a project code and the structure, either the project cost structure or the project operational structure. For example, if a material task code is "USA-P3" and a project code is "USA12345678", this field displays a link to the project operational structure as "USA12345678!USA-P3". |
Start date (field RCPDATDEB) |
These two fields are used to define the date ranges.
|
Product (field ITMREF) |
This field contains the reference identifying the product. |
Status
Invoiced (field INVFLGO) |
When this box is selected, receipts completely invoiced are selected. |
Not invoiced (field INVFLGN) |
The receipts that are not invoiced or only partly invoiced are selected when this box is checked. |
Block number 3
Posted (field PSTFLGO) |
This check box is used to select the receipts for which an invoice to be received has been generated. |
Not posted (field PSTFLGN) |
This check box is used to select the receipts for which no invoice to be received has been generated. |
Tab Search results
This section displays all goods receipt lines that meet the defined selection criteria. The receipt date and pricing information for each line is included.
The columns displayed in the grid or table and the order in which they are displayed is determined by the Inquiry screens function for code 'CPS'.
Grid
Receipt no. (field PTHNUM) |
Supplier (field BPSNUM) |
Bill-by BP (field BPSINV) |
Pay-to (field BPRPAY) |
Address (field BPAADD) |
Project (field PJT) |
This field displays the associated project code. The content can be one of the following:
If the content of this field includes a character such as an exclamation mark "!" this field links to the structure of the project. The character is the separator between a project code and the structure, either the project cost structure or the project operational structure. For example, if a material task code is 'USA-P3' and a project code is 'USA12345678', this field displays a link to the project operational structure as 'USA12345678!USA-P3'. To provide a quick and easy visual reference the link to the project or project structure is distinguishable by the number of separator characters used. If there is no separator, the link is made to the project. A single separator character such as an exclamation mark after the project code (the first code) indicates the link type is a task (the link is to the project operational structure). Two separators placed after the project code mean that the link corresponds to a budget code (link to the project budget structure). |
Receipt date (field RCPDAT) |
Delivery mode (field MDL) |
Product (field ITMREF) |
Receipt UOM qty. (field QTYUOM) |
STK-PUR conversion (field UOMPUUCOE) |
PUR quantity (field QTYPUU) |
Returned PUR qty. (field RTNQTYPUU) |
Invoiced PUR (field INVQTYPUU) |
Purchase unit (field PUU) |
Currency (field CUR) |
Net price (field NETPRI) |
Order site (field POHFCY) |
Order no. (field POHNUM) |
Receiving site (field PRHFCY) |
Shipment number (field SHIPNUM) |
Description (field ITMDES) |
Receipt unit (field UOM) |
Line amount - tax (doc) (field LINAMT) |
Line amount - tax (co) (field LINAMTSOC) |
Line amount + tax (doc) (field LINATIAMT) |
Line amount + tax (co) (field LINATIAMTS) |
Landed cost coef. (field CPRCOE) |
Purchase cost per unit (co) (field CSTPUR) |
Purchase cost per unit (doc) (field CSTPURDOC) |
Line type (field LINTYP) |
Fixed cost per unit (co) (field CPRAMT) |
Purchase cost (co) (field LINCSTPUR) |
Purchase cost (doc) (field LINCSTPURD) |
Tax rule (field VACBPR) |
Weight (field QTYWEU) |
Weight unit (field LINWEU) |
Volume (field QTYVOU) |
Volume unit (field LINVOU) |
Receipt |
Click Receipt from the Actions icon to view the purchase receipt details. The transaction you select determines the way in which you enter information, and how information is displayed and printed. If only one transaction has been set up you are not offered a choice, the default entry screen is displayed. |
Supplier order |
Click Supplier order from the Actions icon to view the purchase order details. The transaction you select determines the way in which you enter information, and how information is displayed and printed. If only one transaction has been set up you are not offered a choice, the default entry screen is displayed. |
Purchase journal traceability |
Click Purchase journal traceability from the Actions icon to open the Journal traceability inquiry where you can view or browse through the hierarchy of documents created from this purchase receipt line. |
Specific actions
Click the Search action to load the table (grid) with purchase receipt lines that meet the entered selection criteria. The maximum number of lines displayed is defined in the Inquiry screens function for code 'CPS'. |
Click the Criteria action to access additional selection and display criteria. You can filter the receipt lines to be processed by analysis group and modify the sort order.
Screen code. You can select the required customized inquiry screen, if you are using personalized inquiries.
Please see the Inquiry screens documentation.
You can save one or several sets of criteria using the Memo action. You can recall these using the Recall action or delete them using the Delete memo action.
Selection
Active memo (field MEMO) |
Company (field CPY) |
This screen defines the criteria for the selection and display of the receipts to be viewed. |
Receiving site (field PRHFCY) |
This screen defines the criteria for the selection and display of the receipts to be viewed. |
From supplier (field BPSNUMDEB) |
To supplier (field BPSNUMFIN) |
From receipt no. (field PTHNUMDEB) |
This screen defines the criteria for the selection and display of the receipts to be viewed. |
To receipt no. (field PTHNUMFIN) |
From project (field PJTDEB) |
Use these fields to filter for results within a range of project codes. For a single project, enter the same project code in the From/start project and To/end project fields. The content can be one of the following:
If the content of this field includes a character such as an exclamation mark "!" this field links to the structure of the project. The character is the separator between a project code and the structure, either the project cost structure or the project operational structure. For example, if a material task code is 'USA-P3' and a project code is 'USA12345678', this field displays a link to the project operational structure as 'USA12345678!USA-P3'. To provide a quick and easy visual reference the link to the project or project structure is distinguishable by the number of separator characters used. If there is no separator, the link is made to the project. A single separator character such as an exclamation mark after the project code (the first code) indicates the link type is a task (the link is to the project operational structure). Two separators placed after the project code mean that the link corresponds to a budget code (link to the project budget structure).
|
To project (field PJTFIN) |
Whole project (field PJTDSPALL) |
Select this check box to view all records linked to the selected projects. To only view records linked to the selected structure of the projects, leave this check box clear. If the value of the From/To project field includes a character such as an exclamation mark "!" the search includes the structure of the project. The character is the separator between a project code and the structure, either the project cost structure or the project operational structure. For example, if a material task code is "USA-P3" and a project code is "USA12345678", this field displays a link to the project operational structure as "USA12345678!USA-P3". |
Start date (field RCPDATDEB) |
This screen defines the criteria for the selection and display of the receipts to be viewed. |
End date (field RCPDATFIN) |
Product (field ITMREF) |
field TSICOD |
field TSSCOD |
Status
Invoiced (field INVFLGO) |
This screen defines the criteria for the selection and display of the receipts to be viewed. |
Not invoiced (field INVFLGN) |
Posted (field PSTFLGO) |
Not posted (field PSTFLGN) |
Printed (field PRNFLGO) |
Not printed (field PRNFLGN) |
Display
Screen code (field ECRAN) |
Sort order (field TRI) |