Use this function to update pending work orders with routings and bills of materials (BOMs) that have been modified. Any changes to the technical data can be carried forward.

You are advised to run this function on a regular basis and especially after any modification to a BOM or routing.

Prerequisites

SEEREFERTTO Refer to documentation Implementation

Screen management

The Upgrade function displays an initial screen into which you enter your selection (or filtering) criteria. Pending work orders (field Status='Pending') will be selected from the criteria you provide. You process the work orders from a second screen.

Search results

Use the Selection criteria and Filters sections to define the production site and status of the work orders to be included.

A 'Planning' type formula is available to complete these selections.

Work orders with the status 'Being optimized' can be included if extended using an entry point.

Start/end ranges

A number of ranges are displayed.

  • To read all pending work orders, leave all the fields blank.
  • To read the status of selected pending work orders, type in the required ranges. Leave the first field blank to include the lowest value.


You must then select the elements (BOMs, routing) of a work order to be updated.

Tab Search results

For the specified production site, the system selects all pending work orders (field Status='Pending') that meet the entered selection criteria. The planned production start date, routing information and the BOM code are included.

Batch task

This function can be run in batch mode. The standard task FUNMAUTM is provided for that purpose.

Specific actions

Error messages

In addition to the generic error messages, the following messages can appear during the entry :

No work order processed

This message is displayed if no deletion could be carried out.

Tables used

SEEREFERTTO Refer to documentation Implementation