Production slip
Use this function to view the structure of a bill of material (BOM) and a routing for a specific date, and the components and routing operations that apply on that date.
A bill is made up of assemblies, subassemblies, and components. If an assembly is used as one component in the list to make a final product, it’s referred to as a subassembly. Any number of subassemblies can exist in an assembly's component list. Each subassembly will itself have a list of components, and this list can also contain subassemblies.
A routing is a sequence of operations and tools that are involved in producing or processing the product or assembly.
This function provides a hierarchical view of the structure of the BOM and the machine, operator, and tool that's needed for each production operation. You can view the components and routing operations for a single level or the whole multilevel hierarchy.
Prerequisites
Screen management
The Production slip function displays a single screen into which you enter a site, a bill of material, and a routing, and the date you want the details to be displayed for.
The structure of the bill and routing operations are displayed in the Components table. Icons symbolize the various elements of the bill and routing. They provide a quick visual reference to the element.
Entry screen
You use this screen to enter details of the bill of material and routing to view and your reference date.
Parent product
| BOM type (BOMALTTYP) |
| This field displays Manufacturing. |
| Storage site (STOFCY) |
| The product storage site. |
| Parent product (PARITMREF) |
|
This parent product code describes what is referred to as a "Bill of Material" or a "BOM". A BOM contains structured information for making and costing a product. It defines the components that make up a product, and given this, the cost of the product. The parent product code is a stock code. It’s the assembly or finished goods code. |
| BOM code (BOMALT) |
|
The numeric code associated with a production BOM. Multiple bills of material (BOM) can be defined for a single product. Each BOM code can be assigned specific management features. For manufactured or subcontracted products, this includes restriction of the BOM to a specific site and to specific areas of functionality such as for costing or for capacity planning. Note - settingsRefer to the Use status field (LIBUSESTA) in the Production BOM documentation for tips on using the BOM code in conjunction with the assembly status of the BOM.
|
| Routing code (ROUALT) |
| Multiple routings can be defined for a single product. Each routing code can be assigned specific management features. These include restriction of the routing to a specific site and to specific areas of functionality, such as for use in a manufacturing environment, for costing, or for capacity planning. |
| Reference date (DATREF) |
|
Selects the routing and BOM versions with a validity period that include the date you enter. The current date is the default date.
Note - informationThe routing and production BOM Major version and Minor version fields, and the Reference date field are directly linked. The "version" fields default to the version of the routing and BOM code that applies on the Reference date. |
Management
| Description (BOMDES) |
| The product description. |
| Stock unit (BOMSTU) |
| The unit in which the product is stored. It provides the key to prices, costs, and volumes. |
| Management unit (QTYCOD) |
|
Defines the quantity of the BOM links using a basis other than the product unit. A BOM can therefore be entered for 1 product unit, 100 product units, 1,000 product units, using a percentage, or specifying the size of a "lot". In the percentage definition, the total link quantities need to be equal to 100. |
| Base quantity (BASQTY) |
|
The base quantity is determined by the management unit, as follows:
|
| Validity dates (BOHSTRDAT) |
| The start date of the parent product's validity period or blank if the BOM is valid until the validity end date. |
| BOHENDDAT |
| The final date that the parent product is valid or blank if the BOM is valid indefinitely from the validity start date. |
| Use status (USESTA) |
|
Indicates the assembly status of the BOM. In development: The components that make up the product are being defined. Available to use: The structure of the bill (BOM) is complete and was validated. Note - informationA BOM can only be assigned to work orders when its status is Available to use.
|
Components
You use this section to view the details of the bill of material and routing hierarchy. You can expand and collapse the levels, and select any level to view the details.
Icons symbolize the various elements of the structure of the bill and routing operations. They provide a quick visual reference to the element.
As well as assemblies and components in the BOM, different icons indicate a phantom component, a by-product, subcontracted subassemblies and components, a costing element, and a text line.
Routing operations are supported using a color indicator so that you can easily spot if the operation time that's applied to the production time is fixed or proportional. Icons distinguish the machines, labor, and tools in the routing.
Grid: Components
| Level (LEV) |
|
The individual elements at each level in the structure of the bill of material for the parent product and routing. Icons symbolize the various elements of the structure of the bill and routing operations. They provide a quick visual reference to the element. A bill of material (BOM) is an assembly, a finished item, made up of components, raw materials, and instructions needed to build or maintain the item. A BOM often has a hierarchy of subassemblies in its list of components. Each subassembly will itself have a list of components, and this list can also contain subassemblies. The lowest level of the BOM is individual components and raw materials. As well as assemblies and components, different icons indicate a phantom component, a by-product, subcontracted subassemblies and components, a costing element, and a text line. Routing operations are supported using a color indicator so that you can easily spot if the operation time that's applied to the production time is fixed or proportional. Icons distinguish the machines, labor, and tools in the routing. |
| Description (ITMDES1) |
|
BOM element: The description from the product record. Routing: The description defined for the routing operation or the description of the work center. |
| Sequence (BOMSEQ) |
| Identifies the sequence number of the component in the BOM (bill of material). |
| Link quantity (LIKQTY) |
| The quantity of the component in the stock unit that's needed to make the parent product. The default quantity is defined on the bill of material (BOM) record. |
| Stock unit (STU) |
| The unit in which the product is stored. It provides the key to prices, costs, volumes, etc. |
| Reorder (LIBREOCOD) |
|
The reordering mode. Not managed: No reorder management By MRP: Reordering is calculated by the MRP requirements By MPS: Reordering is calculated by the MPS By ROP: Reorder on threshold By period: Reorder by periodic replenishment |
| Component type (CPNTYP) |
|
Indicates if the component is stored in stock. Physical: This is a physical component. Quantities are stored in stock. Active: This is an active component such as nails or staples. Quantities are not stored in stock. Note - tipActive components have a "potency" percentage defined on the stock record.
|
| Setup time (SETTIM) |
|
Specifies a fixed amount of time needed to prepare a work center. It’s part of the work center load. It’s expressed in either the time unit specified in the routing header or in the standard operation, if a standard operation was applied for the operation. The time can be zero. |
| Run time (OPETIM) |
|
The time needed to manufacture the product described in the routing. The operating time:
|
| Time unit (TIMUOM2) |
|
Defines how time for the operations in the routing is expressed. The time unit can be hours or minutes. The time applies to the setup time, run time, and the rate of all operations in the routing. |
| Link description (BOMSHO) |
| A short description of the component. |
| Subcontracted products (ITMSST) |
| The service to be carried out by the subcontractor to execute the operations. |
Current element
Component detail
| Qty BOM UOM (XBOMQTY) |
|
The quantity of the component that's needed to make the parent product. The default quantity is defined on the bill of material record. |
| XBOMUOM |
| The volume or mass unit of measure. |
| STK link qty. (XLIKQTY) |
|
The quantity of the component in the stock unit that's needed to make the parent product. The default quantity is defined on the bill of material record. |
| XCPNSTU |
| The unit in which the component is stored. It provides the key to prices, costs, volumes, etc. |
| UOM-STK factor (XBOMSTUCOE) |
| The conversion coefficient between the operation unit of the component and the storage unit. It’s initialized from the value specified for the BOM. |
| % scrap (XSCA) |
|
The percentage of the component that you expect to be lost during the production process. Inquiries can display the following figures:
|
| Link qty code (XLIKQTYCOD) |
|
Defines how the quantity of the component in the stock unit that's needed to make the parent product is determined. Proportional: The quantity of the component is multiplied by the quantity required for the parent product. |
| Qty rounding (XQTYRND) |
|
Defines the rounding rule to apply to adjust the calculated quantity of the component to the number of decimal places defined for the stock unit of the parent product. Round to the nearest Greater than: Round up Less than: Round down |
| Stock management (STOMGTCOD) |
|
Defines how stock of the product is managed. Not managed: The product is not managed in stock. It’s a service or a general purchase, for example. Managed Potency managed: A management rule is applied. Management of quantities in stock requires an active quantity and a physical quantity. |
| Reorder mode (XREOCOD) |
|
The suggestion type is used when running Material Requirements Planning. It’s used to define if the product needs to be subject to:
If the suggestion is an Intersite type, the reorder site needs to be specified in the Reorder site field (REFCY). |
| Type (XCPNTYP) |
|
The component type. Normal: A component defined on the bill of material. By-product: An unplanned by-product or secondary product. Text: Free-format text. Costing: When a value is calculated for the provisional cost and the production cost price of the parent product. |
| Validity dates (XBOMSTRDAT) |
| The start date of the component's validity period. |
| XBOMENDDAT |
| The last date of the component's validity period or blank if the component does not have a validity period and is always valid. |
Operation detail
| Setup time (XSETTIM / XTIMUOM1) |
|
Specifies a fixed amount of time needed to prepare a work center. It’s part of the work center load. It’s expressed in either the time unit specified in the routing header or in the standard operation, if a standard operation was applied for the operation. The time can be zero. |
| Preparation time (XPRPTIM / XTIMUOM2) |
|
Preparation time is "waiting time" set at the start of an operation. Preparation time is not applied to the work center load. Note - informationPreparation time is always expressed in hours. It does not use the time unit defined in the routing header (Time unit field).
Although preparation time is waiting time, it can be used for the time it takes to prepare for an operation on a work center. This might be time for settling liquids or cleaning a machine. When preparation time is used for setting time at the start of an operation, the resource needs to be available. When scheduling preparation time, the calendar for the defined resource is applied. This means that if, for example, a machine or labor work center runs from 08:00 to 12:00 and from 13:00 to 17:00 with a 1 hour break from 12:00 to 13:00, preparation time will be interrupted by the 1 hour break. If the operation requires an "emergency release", a reduction coefficient can be assigned that makes it possible to completely remove any preparation time. |
| Run time (XOPETIM / XTIMUOM3) |
|
The time needed to manufacture the product described in the routing. The operating time:
|
| Waiting time (XWAITIM / XTIMUOM4) |
|
Waiting time is "delay time" that occurs after an operation. It’s non-productive time. Waiting time is not applied to the work center load. It's for periods such as drying time or cooling time that occurs after a process was completed on a machine and until the machine can next be used. Note - informationWaiting time is always expressed in hours. It does not use the time unit defined in the routing header (Time unit field).
If machine time is needed for an operation during the waiting time, you should add a new operation to the routing. A machine might be needed, for example, for drying or cooling components at a work center. The additional operation needs to be for the appropriate resource type, such as "cooler". When scheduling time for these resources if, for example, a machine or labor work center runs from 08:00 to 12:00 and from 13:00 to 17:00 with a 1 hour break from 12:00 to 13:00:
|
| Quantity (XBASQTY / XOPEUOM) |
|
The base quantity depends on the management unit. In effect, if the time is expressed for 1 unit, for 100 units or for 1,000 units, the base quantity is forced, respectively to 1, 100 or 1,000 units. However, if the time is expressed for a lot, the base quantity can be entered. If the processed routing code is assigned to a site, it's initialized for the lot size of the product-routing for the site. The base quantity entry format depends on the operation unit. |
| Post op time (XPSPTIM / XTIMUOM5) |
|
Post operation, or post run time is a "deadline" that occurs after waiting time. It's non-productive time. Post run time is not applied to the work center load. It's typically "transfer time", or a transition period from one work center to the next work center that occurs after a process was completed on a machine and until the machine can next be used. Note - informationPost run time is always expressed in hours. It does not use the time unit defined in the routing header (Time unit field).
If operator time is needed for an operation during the post run time, you should add a new operation to the routing. An operator might be needed, for example, for the transportation or carriage, or the transition between 2 work centers. The additional operation needs to be for the appropriate resource type, such as "carrier". When scheduling time for these resources if, for example, a machine or labor work center runs from 08:00 to 12:00 and from 13:00 to 17:00 with a 1 hour break from 12:00 to 13:00:
If the operation requires an "emergency release", a reduction coefficient can be assigned that makes it possible to completely remove any post run time. Note - warningWhen scheduling time for these resources, if both waiting time and post run time was declared for the operation, only the largest of the 2 values is used.
|
| Run time cd (XROOTIMCOD) |
|
The operation time type applied to the production time entry. Proportional: The production time is proportional to the released quantity. It’s expressed in hours and minutes, as based on the time unit for a given number of units, which is based on the management unit and base quantity. Rate: The production time is proportional to the released quantity. The rate is used to express the time in number of units per hour or minute, depending on the time unit. Fixed: The production time is independent of the released quantity. This time is expressed in hours or in minutes depending on the management unit. |
| XTIMCOD |
|
Depending on the resource being used, the number of decimals for the operation time can be insufficient to express the production time. The management unit makes it possible to express the operation time for 1, 100, 1,000, or a lot of units of parts to be produced. |
Text
| Text (TEXTE) |
| Text associated with the operation. For example, information describing how to use the workstation, how to merge colors, how to use tools, the torsional movement to fix a screw. |
Image
| Image (IMG) |
| An image of the product at the level you select in the Components table. |
| Product |
| Select Product from the Actions icon to view or amend the details of the selected product or component. |
| Component where used |
| Select Component where used action to view the list of assemblies in which the selected component is used. |
| Manufacturing BOM |
| Select Manufacturing BOM from the Actions icon for a finished product or subassembly to view or amend the structure of the bill of material (BOM). |
| Stock by site |
| Select Stock by site from the Actions icon to view the inventory levels for the selected product or component, by site. |
| Subcontract BOM |
| Select Subcontract BOM from the Actions icon for a subcontracted subassembly to view or amend the structure of the subcontract bill of material (BOM). |
| Routing |
| Select Routing from the Actions icon to view or amend the routing details. |
Action panel
| First level | Select the First level action to view the list of components in the bill and operations in the routing. An arrow icon indicates a subassembly component. Subassemblies are not expanded. |
| Multilevel | Select the Multilevel action to view the bill of material and the routing hierarchy. |
Error messages
The only error messages are the generic ones.