Efficiency / Cost Selection
This parameter is used in the cost calculation, the different values possible are:
No: no taking into account of the efficiency, the planned times are counted as they are.
Yes: the efficiency is taken into account for the provisional cost calculations. In this case, it is also necessary to take into account the WSTEFFINH parameter (Inherit work centre efficiency).
If WSTEFFINF =No, the efficiency entered in the work centre is combined with that entered in the routing operation. The operation time taken into account is: routing operation time *1/work centre efficiency * 1/routing operation efficiency
If WSTEFFINF = Yes, then the efficiency entered in the work centre is proposed by default in the routing operation. The operation time taken into account is: routing operation time * 1/routing operation efficiency.
This is valid for the setup and operation times.
Level of localization / Global variable
This parameter is defined at the level Folder. It belongs to Chapter GPA (Manufacturing) and the Group COS (Costs), The following parameters are also associated with this chapter and group :
- ARRQTYCPN (Apply link qty rounding)
- CLCBUDRAT (Dimension rate selection bud C)
- CLCCUTRAT (Dimension rate selection act C)
- CLCSIMRAT (Dimension rate selection sim C)
- CLCSTDRAT (Dimension rate selection std C)
- CLCWOCAUT (Auto provisional costs)
- CSTRCPORD (Provisional cost declaration)
- MFCRATCPL (Actual PC dim rate selection)
- MFCRATEXT (Expected PC dim rate selection)
- OPRRATE (Labor rate selection)
- OVECOLBUD (Budget calc overhead column)
- OVECOLCUT (Updated calc overhead column)
- OVECOLMFC (PC calc overhead column)
- OVECOLSIM (Simulated calc overhead column)
- OVECOLSTD (Standard calc overhead column)
- SCAMAJ (Material loss increase / costs)
The global variable GEFFCSTUSE is associated with it.