Provisional cost declaration
This parameter determines which work order cost value must be used in production reporting.
Release - This is the default value for this parameter. Use the provisional 'release', or expected cost for a work order in production reporting. This value calculates provisional release costs from the work order data. This will be for the actual work order quantity and the actual times defined for the route. You should use this value if your manufacturing processes might change the default list of components or routing operations by adding a raw material or changing work centers, for example. The provisional cost declaration is calculated automatically when a work order is released if you use this value.
Theoretical - Use the theoretical provisional cost for a work order in production reporting. This value calculates the theoretical provisional cost for a work order for the provisional, or planned production quantity. The provisional cost calculations use the technical data defined for all components of the bill of materials (BOM), and for the production route.
The following values are not permitted: Expected, Actual, Real cost price for planned quantity and Provisional production for achieved quantity
Level of localization/Global variable
This parameter is defined at the level Folder. It belongs to Chapter GPA (Manufacturing) and the Group COS (Costs), The following parameters are also associated with this chapter and group :
- ARRQTYCPN (Apply link qty rounding)
- CLCBUDRAT (Dimension rate selection bud C)
- CLCCUTRAT (Dimension rate selection act C)
- CLCSIMRAT (Dimension rate selection sim C)
- CLCSTDRAT (Dimension rate selection std C)
- CLCWOCAUT (Auto provisional costs)
- EFFCSTUSE (Efficiency/cost considered)
- MFCRATCPL (Actual PC dim rate selection)
- MFCRATEXT (Expected PC dim rate selection)
- OPRRATE (Labor rate selection)
- OVECOLBUD (Budget calc overhead column)
- OVECOLCUT (Updated calc overhead column)
- OVECOLMFC (PC calc overhead column)
- OVECOLSIM (Simulated calc overhead column)
- OVECOLSTD (Standard calc overhead column)
- SCAMAJ (Material loss increase / costs)
The global variable GCSTRCPORD is associated with it.
Functions impacted
The following functions are associated with this parameter :
Costing > Production costs > Calculate expected cost
Manufacturing > Planning > Work order
Costing > Production costs > WIP cost inquiry