Actual PC dim rate selection
This parameter defines which hourly rate on the Costing dimension record is applicable to run time cost calculations involving work centers.
'Standard' - Apply the Standard run (field STDOPECST) rate defined on the Costing dimension record.
'Revised standard' - Apply the Revised run (field CUTOPECST) rate defined on the Costing dimension record.
'Budget' - Apply the Budgeted run (field BUDOPECST) rate defined on the Costing dimension record.
'Simulation' - Apply the Simulated run (field SIMOPECST) rate defined on the Costing dimension record.
Level of localization/Global variable
This parameter is defined at the level Site. It belongs to Chapter GPA (Manufacturing) and the Group COS (Costs), The following parameters are also associated with this chapter and group :
- ARRQTYCPN (Apply link qty rounding)
- CLCBUDRAT (Dimension rate selection bud C)
- CLCCUTRAT (Dimension rate selection act C)
- CLCSIMRAT (Dimension rate selection sim C)
- CLCSTDRAT (Dimension rate selection std C)
- CLCWOCAUT (Auto provisional costs)
- CSTRCPORD (Provisional cost declaration)
- EFFCSTUSE (Efficiency/cost considered)
- MFCRATEXT (Expected PC dim rate selection)
- OPRRATE (Labor rate selection)
- OVECOLBUD (Budget calc overhead column)
- OVECOLCUT (Updated calc overhead column)
- OVECOLMFC (PC calc overhead column)
- OVECOLSIM (Simulated calc overhead column)
- OVECOLSTD (Standard calc overhead column)
- SCAMAJ (Material loss increase / costs)
The global variable GMFCRATCPL is associated with it.
Functions impacted
The following functions are associated with this parameter :
Costing > Production costs > Calculate expected cost
Costing > Production costs > WIP finalization