Use budget envelopes to plan operating or investment expenses that can extend to one or multiple fiscal years defined by the entry of the envelope's start and end dates.
The budget type determines whether the envelope is annual or multi-annual.
Parameter GDDPRJENV project/envelope connection (GDD chapter, GDD group), which can be defined at company or folder level, is used to determine whether the attachment of an envelope to a project is mandatory or optional. In this last case, some envelopes can be attached to a project while others are not.
Budgets by fiscal year are distributed throughout budget lines, by budget account and by recipient entity.
Once the budget creation is complete, the approval process of envelopes, budgets and budget lines makes it possible to set the validated amount of determined forecasts. The commitment entry (Purchase requests, orders and invoices) can only be carried out after budget line approval.
After approval, any modification of budgeted amounts is submitted to budget reviews in order to track all the modifications applied after approval.
Use the envelopes entry screen to deduce from the envelope amount, an amount used as a reserve. This reserve can be created to account for the possible uncertainties of the prevision: Completion date, expected amount, etc. The reserve reduces the available envelope amount for its split into budgets.
The reserve is a prevision blocked by the budget manager. It can be used at any time during the fiscal year, with no further authorization and without using the revision process. Once the envelope or budget is approved, this reserve can be:
The reserve can also be used in the overrun management in expenditure entry if the user parameters allow it (see the overrun management).
The start and end dates of budget envelopes lead to the automatic creation of budgets for the covered fiscal years. These budgets are created with no amount in a grid of the envelope entry screen. The budget manager must carry out the distribution of the available amount of the envelope (Envelope amount - reserve) to the created budget(s). Similarly to envelopes, budgets consist of a field used to create a reserve that reduces the available budget amount used for the split into budget lines. This reserve follows the same management rules as the reserve created for envelopes.
Budgets by fiscal year are divided into budget lines containing a budget account and budget-consuming entity identification.
Two access types are available for creating budget lines:
In budget envelope creation, it is possible to indicate that this envelope must be created without amount. This option is carried out by ticking box "Off budget" in the entry screen. It is used to commit expenses on envelopes, budgets and budget lines whose planned amount is unknown upon budget completion, or that are not to be indicated. The management and evolution of these envelope types follow the process described below:
A project can be defined for a site, a company or be transverse, i.e. defined for a group of companies or sites.
A budget envelope is linked to a budget code. This budget code define if the tracking level is the site or the company. Depending on this rule, the envelope is attached either to a company or a site.
The project, budget and budget line definition level follows the following management rules:
For a budget code defined at company level, the definition possibilities are the following:
Object | Case 1 | Case 2 | Case 3 |
PROJECT | Group of companies | Company | No project |
ENVELOPE | Company | Company | Company |
BUDGET | Company | Company | Company |
BUD LINES | Company | Company | Company |
For a budget code defined at site level, the definition possibilities are the following:
Object | Case 1 | Case 2 | Case 3 | Case 4 | Case 5 |
PROJECT | Group of companies | Group of sites | Company | Site | No project |
ENVELOPE | Site | Site | Site | Site | Site |
BUDGET | Site | Site | Site | Site | Site |
BUD LINES | Site | Site | Site | Site | Site |
The groups are dynamic and can be modified. The user has to check that their modifications are consistent.
The approval process contains two functions:
The review status is set to Approved after the last signature has been obtained. When a review request is approved, the Approved amount on all linked records is not updated. This amount is frozen with the value of the first approved amount for traceability purposes. To see how the Approved amount has changed, run the Review inquiry function.
If one of the circuit signers denies the review, its status is set to Rejected.
During the entire approval cycle, you cannot modify the envelope, budget, budget lines, and review request. This control ends as soon as the review is approved or rejected.
You can only cancel a review after approval with a reverse review.
When approving a single object, the approved amount of this object can be modified, in the limit of the controls applied. For example: The envelope amount cannot be lower than the total of its budgets.The budget amount cannot exceed the envelope amount and must be lower that the total of its budget lines, etc.
Only budget objects having amounts can be submitted to approval and approved, except for those with type Off budget that can be submitted to approval and approved with an amount that equals zero.
The envelope, budget, and budget line approval management is subject to three company parameters used to define controls (Yes/No) to be performed on each budget level. There is no specific consistency control between the various values.
These parameters (GDD chapter, GDD group) are used to specify whether:
The various possible combinations are the following:
Consequences: |
Envelope |
Budget |
Line/row |
1 The status of each level evolves independently |
Yes |
Yes |
Yes |
2 The budget line status evolves based on the status of its budget. |
Yes |
Yes |
No |
3 The budget status evolves based on the status of its envelope |
Yes |
No |
Yes |
4 The budget and budget line status evolves based on the envelope |
Yes |
No |
No |
5 Only the budget and line statuses evolve |
No |
Yes |
Yes |
6 The budget line status evolves based on its budget |
No |
Yes |
No |
7 Only the budget line status evolves |
No |
No |
Yes |
The combination No + No + No is prohibited by a control applied to the general parameters entry.
If a level is set to No, its Status field will be assigned the status of the superior entity upon creation and will follow this status upon updates.
Thus, if a budget line subject to the evolution of its budget is created after budget submission, this line is created with status Approved; if it is created after approval of its budget, it is created with status Approved. The approval refusal of an object submitted to approval leads to setting the objects linked to its evolution back to status Entered. In the previous example, if the budget is subject to an approval refusal, all its lines take status "entered".
These various approval levels are processed sequentially and based on distinct approval patterns that can be set up:
The implementation of an approval management implies the following operation:
The application contains a budget overrun management which can be set up based on the company management rules. The budget overrun management is used to authorize the budget overrun in purchasing based on criteria that can be set up for envelopes with a type other than "Off budget".
Some BUD general parameters are common to operating and analytical budgets.These parameters must contain the following values for the controls on operating budgets to be carried out:
Parameter | Description | Value |
BUDCNTPRP | Pre-commitment control type: | Blocking |
BUDCNTCMM | Commitment control type: | Blocking |
BUDCTLPSL | Approval request line information control | YES |
BUDCTLPOL | Order line information control | YES |
BUDCTLPSH | Approval request management control | Yes |
BUDCTLPOH | Order management control | Yes |
|
|
|
The following ACH general parameters relating to the commitment and pre-commitment generation must also be activated:
Parameter | Description | Value |
PURCMM | Commitment update | YES |
PURCMMPRP | Pre-commitment update | YES |
GDDBUDDEP parameter: This parameter allows the following choices:
Parameter choice | Authorized overrun |
No overrun | No overrun is authorized |
In the limit of what remains from the budget to be distributed | Overrun restricted to what remains from the budget to be distributed |
In the budget reserve limit | Overrun restricted to what remains from the budget to be distributed + its reserve |
In the limit of what remains from the envelope to be distributed | Overrun restricted to what remains from the budget to be distributed + its reserve + what remains from the envelope to be distributed |
In the envelope reserve limit | Overrun restricted to what remains from the budget to be distributed + its reserve + what remains from the envelope to be distributed + envelope reserve |
Envelope overrun | Overrun of the envelope amount with a tolerance % |
Envelope amount overrun %: Parameter GDDBUDPRC is used to enter an authorized overrun percentage for the envelope amount. It is relevant only if the potential overrun parameter is "Envelope amount overrun". This percentage is calculated based on the amount of the budget line, budget by fiscal year or budget envelope defined in parameter GDDBUDCTL. The envelope contains an overrun % field used to apply an overrun % different from that of the general parameters, which is applied in priority when entered.
Budget control level: Parameter GDDBUDCTL means that in case of authorized envelope amount overrun, the authorized overrun amount will be calculated based on the entered percentage applied to the line, budget or envelope amount, depending on the selection carried out: Line, Fiscal year or Envelope
So as to satisfy every company legal context, posted amounts in expense accounts must correspond -depending on cases- to:
The application is used for the posting of expenses and the generation of pre-commitments, commitments and expenses according to one of theses three options. Corresponding budgetary postings are done according to the same rules.
This commitment mode is determined by the PURCMMTAX - Commitment type parameter (ACH chapter, CMM group). The posting of invoices and credit notes and their budget upload depends on the VAT rate and on the deduction percentage.
The supplier code contains the tax rule. Purchase requests can be entered without supplier code: therefore, the PURVACBPR- Default tax rule parameter (ACH chapter, CMM group) can be used to stock a default tax rule for the entry of purchase requests, for the company or the site.
It is not possible to delete an envelope including budget lines, it is necessary to delete the budget lines first, if their situation allows it.
An approved budget line cannot be deleted, it is not possible to cancel the approval of a budget line including expenses (pre-commitments, commitments or completed).
An envelope that does not include a budget line can be deleted, with the following updates:
The envelope recording and modification function contains three tabs:
Presentation
The envelope entry screen header is used to define envelope types: Code and description, envelope type (annual or multi-annual), and budget code that determines whether the envelope is defined at the site or company level.
Close
Fields
The following fields are present on this tab :
|
The budget type determines if the envelope is annual or pluriannual (if the numbering is automatic or manual) and the associated counter. Compulsary information, to be entered or searched for in the 'Budget types' tables. |
|
A budget envelope is linked to a budget code. This budget code defines the tracking level (Site or Company). Depending on this rule, the envelope is attached either to a company or to a site. All lower levels (fiscal year, line) inherit the company code or site code associated with the envelope. The budget chart of accounts must be the same as the chart of accounts of the main analytical ledger of the company. Otherwise, the envelope creation is prohibited. The dimension types determined in this budget code and in the analytical ledger to which the company is linked must be identical. This budget code must be reserved for the Operational budgets. This allocation is made possible by checking the indicator "Operating budget" of the budget code. In this case, the entry of the analytical budgets by the standard functions is prohibited under this budget code. The management of the operating budgets is triggered and the envelopes, budgets by fiscal year and budget lines are attached to this budget code. |
|
Code of the currency used to manage the budget envelope, controlled in the currency table, originates from the budget code and cannot be modified. |
|
The budget envelope is entered or generated automatically when creating the envelope and according to the 'Budget type' and 'Associated counter'setup. |
|
  |
|
Standard title of the current record. |
|
The short description replaces the standard description when display or print constraints require it. By default the short title, the long title or the column header of a data are recorded (on creation/update) in the connection language of the user.
A user who logs on with this language will view the short description, long description or column header in their connection language if a translation exists. Otherwise, these descriptions will be available in the folder language.
|
Close
Fields
The following fields are present on this tab :
Accessibility
|
Envelope assignement project code. Depending on the setup, the project code can be compulsary or optionnal. It can be entered with existence control in the project table or searched for by selection in this table. |
|
Code of the site or the company defining the envelope. If the envelope is defined on a budget code managed by site, this code is necessarily a site. If the envelope is defined on a budget code managed by company, this code is necessarily a company. |
|
Title associated with the Site code and Company code. |
|
This access code makes it possible to prohibit access to the current record for some users. If the field is populated only users that have this access code with read access rights (and write access rights respectively) can view (or with write access rights, modify) the record. |
History
|
Budget envelope status, entered automatically according to the progress of the budget envelope (cannot be modified). It is managed in the message table 2691 that assigns the corresponding status accordint to the events on the envelope:
|
|
Date entered when approving an envelope. Cancelling the approval resets this zone. |
|
Zone loaded with the last approved revision date of the envelope. |
|
  |
Organization
|
Entity responsible for the management of the budget envelope, its budgets and budget lines. |
|
Entity authorized to perform budgetary approval. Information retrieved from the responsible entity, cannot be modified. If the code of the responsible is entered in the approval entity zone:
|
|
Assignment entity of the responsible entity. Deducted from the responsible entity; cannot be modified directly. The entity table should be therefore modified. |
Characteristics
|
Budget envelopes have a start and end date destined to determine the covered budget FY and not to operate forecasts by periods. This information is compulsary. The end date of an annual envelope (for the automatic generation of the budget by FY corresponding to an annual envelope) and of the budgets covered for a pluriannual envelope. |
|
Actual budget End date of the budget envelope. This information should be entered.
|
|
'Off-budget' indicator. The 'Off-budget' box allows the creation of an envelope, its budgets and its budget lines with no amount. Entering amounts is prohibited. Validating 'Off-budget' budget lines allows the entry of purchase requests, orders and invoices on these budget lines, resulting in a negative balance of the budget lines, budgets by FY and envelopes, without overrun limit. |
|
Envelope reconduction indicator. This indicator is applied only to annual envelopes. This field cannot be accessed for pluriannual envelopes. If this indicator is checked, il will be possible to use the annual envelope again on the following FY in order to prevent the re-entry of similar data. |
|
This 'Overrun control' percentage is relevant only if the potential overrun parameter is 'Envelope amount overrun'. This percentage is calculated based on the amount of the budget line, budget by fical year or budget envelope. If an overrun percentage is defined in the general parameters, entering this field in the envelop makes it so that the priority will be given to this percentage over the general parameters. |
|
Clear description of the percentage. |
Amounts
|
Budgeted amount of the budget envelope, ex-tax. This amount is initialized when creating the envelope and can be modified freely before approval. After approval, this amount cannot be modified directly anymore, but only via revisions. An envelope created with a blanck amount will not be submitted to approval, nor approved, unless it is not flagged "Off-budget". |
Code of the envelope amounts' currency. This information cannot be modified and is retrieved from the budget code. |
|
Report of the total budgeted amount of the budgets, ex-tax. Calculation carried out corresponding to:
|
|
Report of the total of the budget lines posted on the budgets, ex-tax. Calculation carried out corresponding to:
|
|
Approved budgeted amount of the envelope, ex-tax. The approval fixes the 'approved amount' of the envelope. Cancelling the approval resets this amount. |
|
  |
|
Total of the purchase requests posted on the budget line, ex-tax Calculation carried out corresponding to:
|
|
Budgeted amount of the reserved envelopes, ex-tax. Optional zone that can be entered when creating the envelope. The reserve is included in the envelope, this amount must be strictely lower than the envelope amount. The envelope amount deducted from the reserve determines the available amount that can be divided in budgets by FY. This reserve can be used throughout the envelope's life, before or after approval The lower the envelope reserve amount, the higher the left-to-distribute amount. The higher the envelope reserve amount, the lower the left-to-distribute amount. After approval, it is limited to the available amount, left-to-distribute in envelope''s budgets. |
|
Total of the reserve amounts of the envelopes' budgets, ex-tax. Calculation carried out corresponding to:
|
|
Total of the purchase orders posted on the budget line, ex-tax Calculation carried out corresponding to:
|
|
Envelope available amount balance, ex-tax. Calculated amount corresponding to:
This amount is used to divide the envelope's amount into budgets by FY. |
|
Available balance of the total of budgets, ex-tax. Calculation carried out corresponding to:
This amount is used to divide the total of budget amounts into budget lines. |
|
Total of the invoices posted on the budget lines of the envelope, ex-tax. |
|
Total budgeted amount of the budgets, ex-tax. Calculation carried out corresponding to:
|
|
Calculation carried out corresponding to:
|
|
Total of the actual amount of the envelopes' budget lines, ex-tax. Calculation carried out corresponding to:
|
|
Left-to-distribute of the envelope (ex-tax). Calculation carried out corresponding to:
|
|
Left-to-distribute amount of the budget, ex-tax. Calculated amount corresponding to:
|
|
Left-to-distribute amount of budget lines (ex-tax). Calculation carried out corresponding to:
|
Grid Budgets
|
Start date of the FY budget. Date loaded, cannot be modified, for the start date of the budget envelope for an annual envelope. For a pluriannual envelope, this date is loaded (and cannot be modified) by the start date of the envelope if the budget corresponds to the first budget of the envelope. For following budgets, this date is loaded (and cannot be modified) by the start date of the FY. |
|
End date of the FY budget. Date loaded, cannot be modified, for the end date of the budget envelope for an annual envelope. For a pluriannual envelope, this date is loaded (and cannot be modified) by the end date of the envelope if the budget corresponds to the last budget of the envelope. For previous budgets, this date is loaded (and cannot be modified) by the end date of the FY. |
|
Fiscal year code and vintage fiscal year budget code. |
|
Budgeted amount of the budget, ex-tax. This amount is initialized when creating the budget and can be modified freely before approval. After approval, this amount cannot be modified directly anymore, but only via revisions. A budget created with a blanck amount will not be submitted to approval, nor approved, unless it is checked "Off-budget". |
|
Approved budgeted amount of the budget, ex-tax. The approval of the budget (or the envelope's if the budget is not submitted to approval) fixes the 'approved amount' of the budget. Cancelling the approval resets this amount. |
|
Budgeted amount of the reserved budget, ex-tax. Optional field that can be entered when creating the budget. The reserve is included in the budget, this amount must be strictely lower than the budget amount. The budget amount, minus the reserve determines the available amount that can be divided in budget lines. This reserve can be used throughout the envelope's life, before or after approval The lower the bugdet reserve amount, the higher the left-to-distribute amount. The higher the bugdet reserve amount, the lower the left-to-distribute amount. After approval, it is limited to the available amount, left-to-distribute in budget lines. |
|
Stauts of the FY budget, entered automatically according to the budget's progress (cannot be modified) It is managed in the message table 2691 that assigns the corresponding status accordint to the events on the budget:
|
|
Budget approval date loaded when approving the budget. Cancelling this approval resets this zone. |
|
Zone loaded with the last approved revision date of the budget. |
Close
Action icon
This button is used to directly access the entry, the modification or the inquiry of the budget lines attached to the budget.
This button is used to send a budget approval request to the manager of the approval entity. This request is carried out by workflow message warning the budget signatory.
If the budget has been subject to revisions, this button is used to access the inquiry of all revisions completed on the budget.
This button is used to access the envelope, budget and budget line budget situation inquiry.
Used to access the list of purchases assigned to the budget line. This list classified by recipient entity and account (budget line), presents the purchase request lines, the order lines and the invoice lines assigned to this budget line.
Each record mentions its tax excl. amount in entry currency. If this record belongs to the pre-committed or committed amount, its amount converted to the ledger management currency is displayed in the corresponding column (pre-committed or committed amount).
The pre-committed, committed and invoiced amounts can differ from the tax excl. amounts of the records for two main reasons:
Close
Presentation
This tab contains three descriptive sections:
Close
Fields
The following fields are present on this tab :
History/statistics
The statistic groups are free fields available for reporting needs. Different codes can be managed in the miscellaneous tables 341, 342, 343, 344 and 345, these are not accessible in modification mode. The description displayed on the screen can be modified via the acess to local menu no 2695. The statistical groups are used in the ENVELOPE and in the PROJECT. After modification of descriptions, the screens that correspond to the PROJECT and the ENVELOPE must be validated so that the modification can be taken into account. The number of statistical groups displayed on the screen is driven by the STP sizing activity code. |
Grid Fund providers
|
'Financer' BP code, controlled in the BP table. |
|
Amount financed by the selected BP, in the envelope currency, ex-tax. No control with the envelope amount. |
|
Currency of the amount financed by the BP. Entered in the envelope currency field, cannot be modified. |
Grid Forecasts/period
|
Fprecast of the period start date. Free entry, no control with the start or end date of the envelope. |
|
Forcast of the period end date. Free entry, no control with the start or end date of the envelope. |
|
Planned amount by period, in the envelope currency, ex-tax. |
|
Currency of the predicted amount by period, initialized with the currency of the envelope, cannot be modified. |
Close
Presentation
This tab is used to enter or copy an envelope description by using a document of type WORD, EXCEL or POWER POINT.
The document type is selected upon document creation. When the document is created with a determined type, it is impossible to change the document type without deleting the original document. Thus, a document created with type WORD cannot be transformed into an EXCEL document without deleting the WORD document. If there is a document type change, a message informs the user of the original document deletion.
Close
Fields
The following fields are present on this tab :
History/statistics
The statistic groups are free fields available for reporting needs. Different codes can be managed in the miscellaneous tables 341, 342, 343, 344 and 345, these are not accessible in modification mode. The description displayed on the screen can be modified via the acess to local menu no 2695. The statistical groups are used in the ENVELOPE and in the PROJECT. After modification of descriptions, the screens that correspond to the PROJECT and the ENVELOPE must be validated so that the modification can be taken into account. The number of statistical groups displayed on the screen is driven by the STP sizing activity code. |
Grid Fund providers
|
'Financer' BP code, controlled in the BP table. |
|
Amount financed by the selected BP, in the envelope currency, ex-tax. No control with the envelope amount. |
|
Currency of the amount financed by the BP. Entered in the envelope currency field, cannot be modified. |
Grid Forecasts/period
|
Fprecast of the period start date. Free entry, no control with the start or end date of the envelope. |
|
Forcast of the period end date. Free entry, no control with the start or end date of the envelope. |
|
Planned amount by period, in the envelope currency, ex-tax. |
|
Currency of the predicted amount by period, initialized with the currency of the envelope, cannot be modified. |
Close
By default, the following reports are associated with this function :
PRTSCR : Screen print
This can be changed using a different setup.
Used to send an envelope approval request to the manager of the approval entity. This request is carried out by workflow message warning the envelope signatory.
Used to access the inquiry of all revisions completed on the envelope.
Used to access the envelope, budget and budget line budget situation inquiry.
Used to access the list of purchases assigned to the envelope. This list classified by FY, recipient entity and account (budget line), presents the purchase request lines, the order lines and the invoice lines assigned to this budget line.
Each record mentions its tax excl. amount in entry currency. If this record belongs to the pre-committed or committed amount, its amount converted to the ledger management currency is displayed in the corresponding column (pre-committed or committed amount).
The pre-committed, committed and invoiced amounts can differ from the tax excl. amounts of the records for two main reasons:
An invoice line does not have to correspond to an accounting entry line since this document can be made of several purchase lines.The fields Quantity, Unit price, Line amount, Product and Description are not loaded when posting a purchase invoice as this data would not be relevant.
Used to access the planned signature circuit inquiry for envelopes pending approval. This inquiry is displayed in the shape of a grid containing a line per signatory. The lines are generated in parallel to the progress in the various signature circuit stages. Each line contains the following information:
Used to access the planned signature circuit inquiry for envelopes pending revision.
This inquiry is displayed in the shape of a grid containing a line per signatory in the approval circuit. Each line contains the same information as that described in the approval in process.
Used, for envelopes subject to approved revisions, to access the completed signature circuit inquiry, to know the approval or refusal date, the code of the last signatory and the revision status.
This inquiry is displayed in the shape of a grid containing a line per signatory in the approval circuit. Each line contains the same information as that described in the approval in process.
When using envelopes linked to an annual budget, accruals can only be managed using the Cost and revenue Accruals function (CPTSVC) and not through the ITAPRE - Analytical apportionment parameter (LOC chapter, ITA group). This parameter is not intended to work with annual budget envelopes.
In addition to the generic error messages, the following messages can appear during the entry :
The entered "Budget type" points to an automatic counter and the user tries to manually enter the envelope code in field "Envelope". Erase the entered ode and let the automaton work, or enter a budget type that corresponds to a manual counter.
You have entered a "Budget type" that does not exist in the budget type table. Select a budget type in the list.
You have entered a "Budget type" not flagged as "Operating budget". Select a budget code in the list that only displays budget codes flagged "Operating budget", or modify the setup of the budget code.
Parameter GDDPRJENV, which is defined at folder or company level, forces the attachment to a project. Search for a project code in the selection list, or modify setup GDDPRJENV.
The envelope company or site currency is different from that of the entered project. Modify the attachment project, pr modify the envelope attachment (budget code, company or site code).
The entered budget code is defined at company level, the project is defined at site group level. You have to select a budget code define at site level if you want to keep the site group, or to select a project defined at company or site group level if you want to keep the budget code.
The entered company code does not exist.
The entered company does not belong to companies belonging to the group of companies to which the entered project is attached. Select the company code in the list that only displays companies belonging to the group of companies or modify the envelope attachment project.
The entered company is attached to a main analytical reference base not ticked as "Operating budgets". Modify the company code.
The indicated site code does not exist.
The entered site does not belong to sites belonging to the group of sites to which the entered project is attached. Select the site code in the list that only displays sites belonging to the group of sites or modify the envelope attachment project.
When a responsible entity is attached to a company, the envelope and the envelope reference project must be created within the same entity. Modify the responsible entity to replace it with an entity that is not attached to a company or attached to the same company as that of the envelope and project.
The budget code and the main analytical reference base of the company must have an ENVELOPE and ENTITY dimension type. You have entered an inappropriate budget or company code, check and modify the entry.
You have entered a "Budget code" and a "Company code" that are not managed in the same currency. Modify either of them for the currency code to be identical.
The project start and end dates concern non created company fiscal years. Modify the project dates or create the necessary fiscal years for the company.
The responsible entity entered is not planned for the envelope entry since it is not flagged "Budget entity". Modify the entity code or the entity setup.
The realization period concerns non created fiscal years. Modify the envelope end date or create the missing fiscal years.
This message appears if an annual envelope start date is replaced by a date inferior to the first day of the fiscal year while the end date is already entered. Modify the entry start date.
For a pluriannual envelope attached to the project, the envelope entry end date is superior to the attachment project end date. Modify the project or envelope end date.
You are trying to decrease the end date of a pluriannual envelope, which means trying to delete the approved budget of the corresponding fiscal year. Cancel the end date modification or cancel the budget approval if controls allow it.
You are trying to decrease the end date of a pluriannual envelope, which means trying to delete the non approved budget containing budget lines from the corresponding fiscal year. Cancel the end date modification or delete the budget lines if their statuses allow it.
This message is displayed when the entry end date is superior to the last fiscal year end date created for the company. You have to modify the end date entry or to create the missing fiscal years.
This message appears if an annual envelope end date is replaced by a date superior to the last day of the fiscal year while the start date is already entered. Modify the entry end date with a date inferior or equal to the date of the fiscal year last day.
On an envelope with status "Entered" you are decreasing the envelope amount or increasing its reserve amount to make the amount available for the fiscal year distribution into budgets inferior to the amount already distributed over the budget(s). Decrease the amount of the budget(s) or correct the envelope amounts. On an envelope with status "Approve" or "Approved", you have increased the amount of the reserve beyond the available envelope amount. Modify the entered reserve amount.
You are increasing the amount of a budget. This provokes the overrun of the available envelope amount. Decrease the entered budget amount, increase the envelope amount, or decrease the amount of its reserve for the sum of the entered budgets to be inferior or equal to the available envelope amount.
You are decreasing the amount of a budget which results in making this amount inferior to the sum of the budget lines posted on this budget. Decrease the amount of the budget lines or increase the amount of the budget.
For a budget with no budget lines, you are entering a reserve amount equal or superior to the budget amount. The reserve amount must be inferior to the budget amount. Modify the entered reserve amount.
For a budget with budget lines, you are entering a reserve amount superior to the available budget amount. The reserve amount cannot be superior to the budget amount - the total of its budget lines. Decrease the entered reserve amount.
Warning message displayed when the envelope has been created with a WORD-type document for instance and when the user chooses a different document type, such as EXCEL or POWER POINT. Answering "Yes" erases the WORD document and the user can create a document of another type; answering "No" is used to keep the original document, which can be modified.
You are trying to create a budget line on an envelope being revised. This action is prohibited as long as the revision is not approved or refused.
The system displays this message when the chart of accounts defined in the budget used, is not identical to the chart of accounts of the main analytical ledger of the company.
This message is displayed when the legislation code entered in the "Budget type" (GESBUT) is different from the legislation code defined for the envelope attachment company. If this legislation code is not entered, this budget type can be used whatever the legislation code of the envelope company.
This message is displayed when the budget code is entered and the company/site code do not include the same analytical dimension types. Change the company/site code or the budget code.
Message displayed when the validity date of the budget code, managing entity, approving entity or reporting entity does not comply with the envelope completion date.
Message displayed when the validity date of the budget account, recipient entity, or third dimension type (analytical dimension) does not comply with the envelope completion date.