Tracked times
Use this function to view quantities processed and setup and run times recorded for a work order. This is referred to as "tracking".
Prerequisites
Refer to documentation Implementation
Screen management
This inquiry is customized to the needs of your organization and your processes. The screen code that you select determines how information is displayed on the Tracked times tab.
Home
Use this section to enter your selection criteria and range filters, then select Search.
Selection
Production site (field MFGFCY) |
Type in or select the work order production site. The default site displayed is associated with your user record but you can edit it. |
Employee ID (field EMPNUMDEB) |
Filter for results within a range of employee codes. For a single employee, enter the same employee code in the from/start Employee ID and to/end Employee ID fields. |
field EMPNUMFIN |
Tracking date (field MFGDATDEB) |
The default tracking date is the current date. Use these fields to limit the display of tracking records to a single date or a range of dates. |
field MFGDATFIN |
Start - end range
Work center (field CPLWSTDEB) |
Filter for results within a range of production resources. They can be machine, labor, or subcontract work centers. For a single production resource, enter the same work center code in the from/start Work center and to/end Work center fields. |
field CPLWSTFIN |
Tracking number (field MFGTNUMDEB) |
Filter for results within a range of production tracking references. For a single production tracking, enter the same tracking reference in the from/start Tracking number and to/end Tracking number fields. |
field MFGTNUMFIN |
Work order (field MFGNUMDEB) |
Filter for results within a range of work order references. For a single work order, enter the same work order reference in the from/start Work order and to/end Work order fields. |
field MFGNUMFIN |
Released product (field RELITMDEB) |
Filter for results within a range of released products. For a single released product, enter the same released product code in the from/start Released product and to/end Released product fields. |
field RELITMFIN |
Tab Tracked times
The screen code that you select determines how information is displayed in this table.
Grid
Tracking number (field MFGTRKNUM) |
The production tracking record that's recording progress for the work order. It could be recording an issue of materials to the work order, activity for a specific operation in a route, or receipt of finished products. |
Time type (field TIMTYP) |
Work order: The declared time relates to an operation for a work order. Product: The declared time relates to a routing operation. Miscellaneous: The declared time relates to time on a work center such as maintenance of a machine. Miscellaneous time is used for recording non-productive time. |
Work center (field CPLWST) |
Identifies the production resource used for the operation, the actual work center used. The work center is the main, or principal work center for the operation. It can be a machine, labor, or subcontract work center. The work center is attached to a work center group. |
Operation (field OPENUM) |
The specific routing operation sequence number that the task was performed for. The operations in a routing used for manufacturing a product are assigned operation numbers. Each operation number corresponds to a task carried out on a given resource, with given times. |
Total actual quantity (field CPLQTY) |
The actual completed quantity, in total. This includes the rejected quantity. The quantity is expressed in the operation unit. |
Actual rejected qty. (field REJCPLQTY) |
The actual quantity rejected. |
Entry unit (field OPEUOM) |
The unit in which the work order operation quantity is expressed. Work order operation quantities are expressed in the operation unit. |
Actual QC quantity (field QUACPLQTY) |
U-OPE conversion (field OPEWORCOE) |
The stock unit to operation unit conversion factor. The factor applied to convert the released quantity of the finished product into the operation quantity, according to the operation unit (Unit field (OPEUOM)). |
Time unit (field TIMUOMCOD) |
The unit of time in which the operation is measured. |
Actual stp. time (field CPLSETTIM) |
The actual time taken to set up the machinery ready for use. The time is expressed in the time unit. The time can be zero (0). |
Actual run time (field CPLOPETIM) |
The actual time taken to perform the operation for the required number of items. Operating time:
|
No. W.O. (field MFGNUM) |
The work order reference. |
Released product (field RELITM) |
The original product code. This product code describes what's referred to as a "bill of material", a BOM. A BOM contains structured information for making and costing a product. It defines the components that make up a product, and given this, the cost of the product. The BOM code matches the product code. |
Routing (field ITMREF) |
The routing code. The routing describes the process involved in building or maintaining a product. The sequence of operations and tools that are involved in producing or processing a particular product. The routing code matches the product code. The product code can be a manufactured product (a bill of material), or a generic reference to a parent routing which is linked to several products. |
Routing code (field ROUALT) |
The routing alternate code. Multiple routings can be defined for a single product. Each routing code can be assigned specific management features. These include restricting the routing to a site and assigning a purpose, such as for a production environment, for costing, or for capacity planning. |
Actual labor W/C (field CPLLAB) |
Identifies the labor work center used for the operation. For example, the labor work center that relates to the crew that operated the machine. |
Message (field MSGNUM) |
The information message code assigned to the production activity recorded for this operation. |
Entry date (field DACDAT) |
The date the transaction log file was created. |
Entered hour (field DACHOU) |
The time the transaction log file was created. |
Milestone (field DACMST) |
The type of production tracking assigned to the operation. No: The operation is not tracked. Normal tracking: The operation is tracked. Range: The operation and all previous non-tracked operations are tracked automatically until the first operation that's set to Normal tracking is found or is itself included in a range of operations. |
Order no. (field POHNUM) |
If the operation is subcontracted to an external supplier, this field displays the purchase order number created for the subcontract operation. |
Line (field POPLIN) |
The line number on the purchase order for the subcontracted product needed for the operation. |
Receipt no. (field PTHNUM) |
The purchase receipt transaction reference for the subcontracted product. |
Supplier (field BPSNUM) |
The code of the subcontract supplier that supplied the subcontracted product. |
Expected price (field EXTPRI) |
The planned cost of setting up and running the machine, tool, or labor resource assigned to perform the operation. |
Actual price (field CPLPRI) |
The actual cost tracked for setting up and running the machine, tool, or labor resource assigned to perform the operation. |
Actual charge (field CPLCRG) |
Employee ID (field EMPNUM) |
Identifies the operator that performed the operation. |
Tracking date (field MFGTRKDAT) |
The date activity for the routing operation was recorded. |
Project (field PJT) |
The associated project code. The content can be one of the following:
If the content of the field includes a character such as an exclamation mark "!" this field links to the structure of the project. The character is the separator between a project code and the structure, either the project cost structure or the project operational structure. For example, if a material task code is "USA-P3" and a project code is "USA12345678", this field displays a link to the project operational structure as "USA12345678!USA-P3".
|
Order (field VCRNUMORI) |
The number of the source document or order. |
Work order |
Select Work order from the Actions icon to view the source work order details. |
Tracking detail |
Select Tracking detail from the Actions icon to view the production receipt details. |
Material consumption |
Select Material consumption from the Actions icon to view components issued from stock and consumed for the work order. |
Production |
Select Production from the Actions icon to view the production tracking details for the work order. |
Specific actions
Error messages
The only error messages are the generic ones.
Tables used
Refer to documentation Implementation