This window is used to update one of the following attributes of an asset in concession. It is not authorized to update the asset after validation of its creation:
- Renewal date
- Contractual renewal obligation
- 'Asset transferred against indemnity' flag
- Update code
This window is called from the Actions menu in the Assets management function.
Notes:
- The update of attributes of an issued asset is prohibited.
- The update of the Contractual renewal obligation is also prohibited if the asset to be renewed is recorded in a renewal preparation operation.
Prerequisites
Refer to documentation Implementation
Screen management
The management for this window is common to all the actions that can be applied to assets.
It is therefore recommended:
1/ First, to enter the parameters linked to the attribute update.
2/ Then, it is possible:
- To either directly validate the entry of these parameters or request the cancellation of the disposal by clicking OK. A consistency check is then carried out on the asset changes. In case of an error, a message is displayed to prevent the update of the asset; it is then necessary to correct the faulty parameters.
- Or to go through an intermediate step to control the entered values by clicking Control. Click the End button to close the control window; the system displays the setup entry window again, which enables the validation by clicking OK if no error was detected, or the correction of the faulty parameters.
When the parameters are correct, use the OK button to validate their application and to return in modification mode to the Assets screen. The value update is only effective after the asset has been saved.
Header
The header contains the asset identification information:
Options
Simulation (field FLGSIM) |
This check box is selected by default and runs the closing in simulation mode. In this case, controls and the process are carried out but there are no updates recorded in the database. Clear this check box to run in actual mode. In this case, you cannot reverse the closing and updates are recorded in the database. If you are using intermediate commits, it is recommended that the NIVTRACE – Log file level parameter (AAS chapter, MIS group) value is 0. |
Report (field FLGETA) |
This indicator can be accessed only when one or several reports are linked to the massive process. In this case, the activation of this indicator enables the user to print these reports. |
Detailed log file (field FLGDET) |
A log file is automatically displayed on process completion, showing the processing parameters. A Statistics section gives the number of selected assets, the number of assets updated as well as the number of assets not processed due to an error. Assets with errors are listed with their error reason. The viewing and printing of log files are possible at any time via the report code ATRACE - Print log file print request, obtained from the Supervisor function in the Print/Group print menu. |
Grid Company selection
field FLGCPY |
Help common to all the mass processings. When the company setupACCPERCTL - Control of accounting periods (chapter AAS, group CPT) has the value 'Yes', the company is not displayed in the list if at least one of its contexts is not synchronized with the accounting period/fiscal breakdown. The desynchronization status of a context is visible in the screenDetailed status of contexts that can be accessed from the Actions icon.In that screen, on the Calculation tab, the field Modification type has the value 'CNX' and the field Modified parameter has the value 'DESYNC'.In this case, it is necessary to launch the processing of Contexts synchronization. |
Company (field CPY) |
This field displays the company code. |
Grid Site selection
field FLGFCY |
The grid displays the list of the sites attached to the companies and for which the user has authorizations. |
Company (field FCYCPY) |
Identification Code for the company which the site is linked to. |
Site (field FCY) |
Identification code of the site. |
Tab Action parameters
This tab is used to choose the information to be modified and to enter a new value.
Attributes
Renewal (field UPDTYP) |
Select, by activating the corresponding radio button, the attribute to modify. The update can be on one attribute at a time. |
Values
Provisional date (field RNWDAT) |
Help common to the unitary and mass processing of terms update. |
Contractual obligation (field OBYRNWCON) |
Help common to the unitary and mass processing of terms update.
|
Transmitted against indemnity (field TPAFLG) |
Help common to the unitary and mass processing of terms update. |
Update code (field CCNACTCOD) |
Reason (field REN) |
This mandatory field is used to specify the reason for the modification. |
Processing description
An actual update carries out the following operations:
- Application of the new value of the modified attribute.
- Update of the asset according to the processing terms described below.
- Generation of a FASCCN – Attribute update event.
Updating the provisional date for renewal results in:
- Setting the asset to To recalculate at provision level.
- Updating the provisional date with the entered date.
Updating the contractual obligation results in:
- Setting the asset to To recalculate at provision level
- Possibly modifying the position of the Effective renewal obligation flag.
Refreshing the update code results in:
- Setting the asset to To recalculate at provision level
- Updating the asset with the entered update code.
Updating the Transferred against indemnity flag results in:
- Setting the asset to To recalculate at provision and depreciation level.
If the flag changes from No to Yes:
- The depreciation method of the plan managing the amortization moves to SA. If the depreciation method was AR, a method change event is generated, and its effective date is:
- either the fiscal year start date when the depreciation total on fiscal year start is equal to 0,
- or the depreciation start date if the asset has a depreciation total at the fiscal year start. The adjustment of this total is calculated as Exceptional depreciation for the period. This results in the recovery of the total for the previous period end in the period depreciation expense and the recovery of the total for the previous fiscal year end on period exceptional depreciation. - The Effective renewal obligation flag is cleared.
- The asset and the Accounting and fiscal context are set to To be calculated.
- The provisions for renewal are reversed.
If the flag changes from Yes to No:
- The depreciation method of the plan managing the amortization is then AR with an end date based on the concession end date. A method change event is generated with the period start date as the effective date.
- If the asset has been subject to a contractual renewal obligation and if the industrial depreciation end date is prior to the concession end date, the effective renewal obligation flag is automatically activated.
- The asset and the Accounting and fiscal context are set to To be calculated.
You can view the events in the Event journal window from the Other info tab of the Assets management function.
Specific Buttons
Recall |
Click this action to enter a Memo code to load the settings associated with the code. |
Delete Memo |
Click this action to delete a Memo code. |