This window is used to update one of the following attributes of an asset in concession. It is not authorized to update the asset after validation of its creation:
 
- Renewal date
- Contractual renewal obligation
- 'Asset transferred against indemnity' flag
- Update code

This window is called from the Actions menu in the Assets management function.

Notes:

  • The update of attributes of an issued asset is prohibited.
     
  • The update of the Contractual renewal obligation is also prohibited if the asset to be renewed is recorded in a renewal preparation operation.

Prerequisites

SEEREFERTTO Refer to documentation Implementation

Screen management

The management for this window is common to all the actions that can be applied to assets.

It is therefore recommended:

1/ First, to enter the parameters linked to the attribute update.

2/ Then, it is possible:

- To either directly validate the entry of these parameters or request the cancellation of the disposal by clicking OK. A consistency check is then carried out on the asset changes. In case of an error, a message is displayed to prevent the update of the asset; it is then necessary to correct the faulty parameters.

- Or to go through an intermediate step to control the entered values by clicking Control. Click the End button to close the control window; the system displays the setup entry window again, which enables the validation by clicking OK if no error was detected, or the correction of the faulty parameters.

When the parameters are correct, use the OK button to validate their application and to return in modification mode to the Assets screen. The value update is only effective after the asset has been saved.

Header

The header contains the asset identification information:

Tab Action parameters

This tab is used to choose the information to be modified and to enter a new value.

Processing description

An actual update carries out the following operations:

  • Application of the new value of the modified attribute.
  • Update of the asset according to the processing terms described below.
  • Generation of a FASCCN – Attribute update event.

Updating the provisional date for renewal results in:

  • Setting the asset to To recalculate at provision level.
  • Updating the provisional date with the entered date.

Updating the contractual obligation results in:

  • Setting the asset to To recalculate at provision level
  • Possibly modifying the position of the Effective renewal obligation flag.

Refreshing the update code results in:

  • Setting the asset to To recalculate at provision level
  • Updating the asset with the entered update code.

Updating the Transferred against indemnity flag results in:

  • Setting the asset to To recalculate at provision and depreciation level.

If the flag changes from No to Yes:

  • The depreciation method of the plan managing the amortization moves to SA. If the depreciation method was AR, a method change event is generated, and its effective date is:
    - either the fiscal year start date when the depreciation total on fiscal year start is equal to 0, 
    - or the depreciation start date if the asset has a depreciation total at the fiscal year start. The adjustment of this total is calculated as Exceptional depreciation for the period. This results in the recovery of the total for the previous period end in the period depreciation expense and the recovery of the total for the previous fiscal year end on period exceptional depreciation.
  • The Effective renewal obligation flag is cleared.
  • The asset and the Accounting and fiscal context are set to To be calculated.
  • The provisions for renewal are reversed.

If the flag changes from Yes to No:

  • The depreciation method of the plan managing the amortization is then AR with an end date based on the concession end date. A method change event is generated with the period start date as the effective date.
  • If the asset has been subject to a contractual renewal obligation and if the industrial depreciation end date is prior to the concession end date, the effective renewal obligation flag is automatically activated.
  • The asset and the Accounting and fiscal context are set to To be calculated.
     
    You can view the events in the Event journal window from the Other info tab of the Assets management function.

Specific Buttons

Check

Activating this button displays a control window to:

  • View the attribute value of the asset before and after update. As this modification can have an impact on the effective renewal obligation, the value of this flag is also displayed.
     
  • Identify with different colors if the asset is associated with an error along with the corresponding error messages.

Click the End button to close the control window; the parameter entry window is displayed again, which enables the operation to be validated by clicking OK if no error was detected, or the faulty parameter to be corrected.

Memo

Click this action to save the current settings to a Memo code to be reused later. The memo is linked to your user profile, not to the function or the screen.

The STD memo code is associated with the screen and is loaded immediately when you open the function.

For more information on the advanced use of the Memo action, refer to the documentation on the General ergonomics of SAFE X3 software.

Recall

Click this action to enter a Memo code to load the settings associated with the code.

Delete Memo

Click this action to delete a Memo code.

Error messages

The only error messages are the generic ones.

Tables used

SEEREFERTTO Refer to documentation Implementation