Provisional funds generation
This function is used to launch a provisional flow generation process for one or several contexts of a company, in order to load the FXDLIFL flow table, whose records are used to produce:
- the preparatory reports for the 2054 (FAS2054) an 2055 (FAS2055) fiscal statements,
- the control reports such as the Fixed assets by account report (FLUIMMOCPT), or the Depreciation flows by account report (FLUAMTCPT),
- and potential other flow reports specifically developed.
Reminder :
- Flows can be viewed at the level of fiscal statement items (grouping fixed assets accounts) and/or at the account level (setup at Contexts management function level).
- Different groups of fixed assets accounts can be created (setup at the Accounting flows definition function level).
- No flow is generated for Cancelled assets, or for the In template holding type.
Principles of flow generation
The record creation in the flow table is carried out:
- Upon activation of the flow management by account or by fiscal statement item, at context setup level: an initial flow for the fiscal year is created for each asset and each plan concerned. As these flows only contain initial information, their statuses are Not generated.
- Upon creating an asset, when the CALAUTVAL - Automatic calculation on validation parameter (AAS Chapter, CLC groups) is set to Yes.
- During the unit calculation of an asset.
- Upon period or fiscal year closing. Flows are created or updated for the closed period or fiscal year with the Definitive status, which indicates that these flows can no longer be modified.
When closing a fiscal year, the flows are also initialized for the next FY for each plan concerned, and for each asset of the company (performed in the same way as for flow activation above-mentioned). Their status is set to Not generated.
- During the generation process of the provisional flows. These flows can only be generated for contexts that have been subject to an actual calculation.
This process is used to generate the flows of all assets of the selected companies, after a new fiscal year opens. This processing can be leveled over the whole first period; it is particularly useful as the processing time of the first closing is no longer jeopardized.
Flows are created or updated with the Provisional status, which indicates that the recorded information is relevant but not definitive as the closing is not completed yet.
This processing can be restarted at any time. In order to optimize processing times, it only applies to the new assets and to those that were subjected to a business action impacting flows (since de last generation).
For further information on the optimization of flows and the impact of business actions on the situation of assets with respect to flows, see the appendix document: Flow optimization.
Prerequisites
Refer to documentation Implementation
Screen management
This function is made up of a single screen that is used to:
- select, on the one hand, the company concerned,
- and, on the other hand, select context(s) for which the provisional flow generation is requested,
- launch the provisional flow generation process.
Header
The header is used to:
- Specify that it is a simulation process.
- Select the company for which the process is requested.
The table only contains the companies meeting each of the following requirements:
- the company has at least one context for which the generation of flows is possible,
- the user has been granted rights for all the sites of the company,
- if the company parameter ACCPERCTL - Accounting period control (AAS chapter, CPT group) has for value Yes, all contexts of the company must be synchronized with the accounting breakdown of fiscal years/periods. The situation of de-synchronization of a context can be viewed at the Detailed status of contexts level, tab Calculation (the value of the field Modification type is: CNX and the value of the field modified Parameter is: DESYNC).
The user can choose the company by selecting the Selection option on the line that corresponds to this company.
Note : After selection of the company, all the sites attached to it are automatically selected.
Options
Simulation (field FLGSIM) |
This check box is selected by default and runs the closing in simulation mode. In this case, controls and the process are carried out but there are no updates recorded in the database. Clear this check box to run in actual mode. In this case, you cannot reverse the closing and updates are recorded in the database. If you are using intermediate commits, it is recommended that the NIVTRACE – Log file level parameter (AAS chapter, MIS group) value is 0. |
Report (field FLGETA) |
This indicator can be accessed only when one or several reports are linked to the massive process. In this case, the activation of this indicator enables the user to print these reports. |
Detailed log file (field FLGDET) |
A log file is automatically displayed on process completion, showing the processing parameters. A Statistics section gives the number of selected assets, the number of assets updated as well as the number of assets not processed due to an error. Assets with errors are listed with their error reason. The viewing and printing of log files are possible at any time via the report code ATRACE - Print log file print request, obtained from the Supervisor function in the Print/Group print menu. |
Grid Company selection
field FLGCPY |
Help common to all the mass processings. When the company setupACCPERCTL - Control of accounting periods (chapter AAS, group CPT) has the value 'Yes', the company is not displayed in the list if at least one of its contexts is not synchronized with the accounting period/fiscal breakdown. The desynchronization status of a context is visible in the screenDetailed status of contexts that can be accessed from the Actions icon.In that screen, on the Calculation tab, the field Modification type has the value 'CNX' and the field Modified parameter has the value 'DESYNC'.In this case, it is necessary to launch the processing of Contexts synchronization. |
Company (field CPY) |
This field displays the company code. |
Grid Site selection
field FLGFCY |
This non enterable flag is activated to indicate that the site is selected. After selection of the company all the sites attached to it are automatically selected. |
Company (field FCYCPY) |
Identification Code for the company which the site is linked to. |
Site (field FCY) |
Identification code of the site. |
All companies |
This button is used to select all companies. Their sites and their contexts are also selected automatically. |
Selection no. |
This option is used to carry out a mass deselection of all the companies previously selected. |
Company status |
This button displays a window containing the list of the companies and the status of each of their contexts regarding calculation, closing and posting. Please refer to documentation Company status. |
Tab Setup definition
This tab contains a table:
- displaying the contexts of the selected company for which the provisional flow generation process is possible: only the contexts on which calculation was made and for which the flow management by fiscal statement or by account is enabled on at least one plan.
- displaying the start and end dates of the current Fiscal year and Period for each of the contexts.
By default, all displayed contexts are selected. To exclude a context from the process, it is necessary to deactivate the Provisional flow checkbox.
By default, the processing is optimized as only flows of new assets and of assets subjected to an action impacting flows are generated. It is however possible to ask for a complete generation of flows by activating the forcing flag.
Option
Force flow generation (field FLGFORCE) |
By default, this flag is not activated. For more information see the document: flow optimization. |
Grid Depreciation contexts
Company (field CPYCNX) |
Context (field CNX) |
This grid displays the list of depreciation contexts for which the information flow generation process can be requested for the selected company. |
Fiscal year (field PERFLX) |
This flag, which cannot be entered, indicates that the process is applied to the current financial year. |
Provisional funds (field SELFLX) |
This tick box is used to select the context for which the provisional account change/modification flows must be generated. |
FY start date (field DATSTRFIY) |
This field contains the start date of the current financial year of the context. |
FY end date (field DATENDFIY) |
This field contains the end date of the current financial year of the context. |
Period start (field DATSTRPER) |
This field contains the current period start date. |
Period end date (field DATENDPER) |
This field contains the current period end date. |