Mass closing/completions
Use this function to complete and/or close one or a range of work orders against which production activity has been tracked.
For work orders that have been completed and/or closed:
- You can continue to record production activity for work orders that are complete but not closed.
- You can only record production activity for work orders that are closed if the cost price has not been calculated for the work order.
Prerequisites
Refer to documentation Implementation
Screen management
The Mass closing/completions function contains a single screen into which you enter your selection, or filtering criteria. The list of work orders to be completed and/or closed is built from the criteria you provide and displayed in a table of results.
Entry screen
Use this screen to enter your selection, or filtering criteria. The list of work orders to be completed and/or closed is built from the criteria you specify and displayed as a list of work orders on a second screen.
The critical fields are the WO close (WTRAIT) field, and in the Allocations block, the Production cost price (PRFFLG) field. If you choose to close the selected work orders you can also choose to calculate the production cost price. Note, however, that once closed and the production cost price has been calculated, no further production activity can be recorded for the work order.
Use the Blocks block to control events that could potentially prevent or block the balancing and/or closure of the work order.
Use the Allocations block to control which actions are carried out at the end of the processing run.
Block number 1
Production site (field WCRFCY) |
Type in or select the production site from which the work orders are to be selected. This field is mandatory. |
WO close (field WTRAIT) |
Start - end range
WO number (field WNUMDEB) |
Product (field WITMDEB) |
Date (field WDATDEB) |
Project (field WPJTDEB) |
Order (field WCDEDEB) |
Filters
Completed WO only (field CLOSED) |
Blocks
If at least one oper is pending (field REAFLG) |
If at least one rel. prod not produced (field LANFLG) |
If at least one material not consumed (field CNSFLG) |
If completed qty. < planned qty. (field QTYFLG) |
Allocations
Track automatic materials (field MATFLG) |
Automatic tracking of operations (field OPEFLG) |
Production cost price (field PRFFLG) |
Tab Search results
This table displays all work order production at the specified site that meet the defined selection criteria. The routing used and current status of each work order are included. You can select individual work orders or all work orders listed to complete, or to close.
Block number 1
Manufacturing site (field WCRFCY) |
Closing date (field CLODAT) |
field FMODIF |
Closing date (field CLODATDET) |
Order no. (field MFGNUM) |
This field displays the work order number. |
WO description (field MFGDES) |
Released routing (field ROUNUM) |
Status (field MFGTRKFLG) |
Start date (field STRDAT) |
This field identifies the planned or actual production start date of the work order. |
End date (field ENDDAT) |
This field identifies the end or required completion date for this work order. |
Project (field PJT) |
This field displays the associated project code. The content can be one of the following:
If the content of this field includes a character such as an exclamation mark "!" this field links to the structure of the project. The character is the separator between a project code and the structure, either the project cost structure or the project operational structure. For example, if a material task code is 'USA-P3' and a project code is 'USA12345678', this field displays a link to the project operational structure as 'USA12345678!USA-P3'. To provide a quick and easy visual reference the link to the project or project structure is distinguishable by the number of separator characters used. If there is no separator, the link is made to the project. A single separator character such as an exclamation mark after the project code (the first code) indicates the link type is a task (the link is to the project operational structure). Two separators placed after the project code mean that the link corresponds to a budget code (link to the project budget structure). |
Order (field VCRNUMORI) |
This field identifies the number of the source document or order. |
Work order |
|
WO tracking |
|
Specific actions
To complete the selected work orders, select the Complete action. The work orders will not be closed; the cost of the finished products will not be calculated. This action is only available for selection if the following conditions are met: |
To close the selected work orders and calculate the cost of the finished products, select the Close action. This action is only available for selection if the following conditions are met: |
To select all work orders, select the Include all action. |
To clear all selected work orders, select the Exclude all action. |