Projects are used to group and document a set of investment or operating expenditure forecast.

The information entered helps the budget holder to refine this global forecast by dividing it into:

  • Annual or pluriannual budget envelopes,
  • Budgets by fiscal years,
  • Lines by budget natures and destination entities, on which purchasing is controlled.

Parameter GDDPRJENV, which can be defined at company or folder level, is used to determine whether the attachment of an envelope to a project is mandatory or optional. In this last case, some envelopes can be attached to a project while others are not.

Project and envelope definition levels

A project can be defined for a site, a company or be transverse, i.e. defined for a group of companies or sites.

A budget envelope is linked to a budget code. This budget code define if the tracking level is the site or the company. Depending on this rule, the envelope is attached either to a company or a site.

The project, budget and budget line definition level follows the following management rules:

  • If a project is attached to a site, the linked envelopes are attached to the same site,
  • If a project is attached to a company, the linked envelopes are attached to the same company,
  • If a project is attached to a group of companies, the linked envelopes are attached to one of the companies belonging to this group or to a site of one of the companies from this group, depending on the budget code characteristics,
  • If a project is attached to a group of sites, the envelopes are necessarily attached to one of the sites from this group.  The budget code must be consistent.

For a budget code defined at company level, the definition possibilities are the following:

Object 

Case 1

Case 2

Case 3

PROJECT

Group of companies

Company

No project

ENVELOPE

Company

Company

Company

BUDGET

Company

Company

Company

BUD LINES

Company

Company

Company

For a budget code defined at site level, the definition possibilities are the following:

Object 

Case 1

Case 2

Case 3

Case 4 

Case 5

PROJECT

Group of companies

Group of sites

Company

Site

No project

ENVELOPE

Site

Site

Site

Site

Site

BUDGET

Site

Site

Site

Site

Site

BUD LINES

Site

Site

Site

Site

Site

SEEINFO The groups are dynamic and can be modified. The user has to check that their modifications are consistent.

Links with the fixed asset management module

Projects contain information planned for a later linkage with the asset management module that should be used, from an investment project, to generate the impact on the fixed asset management in terms of receipts and issues.

SEEINFOThese data remain optional and for information purposes:  Statistical groups, fund providers, forecasts by period, lots, assets.

Prerequisite

SEEREFERTTO Refer to documentation Implementation

Screen management

The project recording and modification function contains four tabs:

  • A "General" tab to enter the project information,
  • A "Lot" tab to carry out its potential division into lots,
  • An "Asset" tab for renewal investment projects used to assign assets to be replaced to the various created lots.
  • An "Office" tab used to enter or import all the relevant information for the project description in the shape of WORD, EXCEL or POWERPOINT documents.

Header

The numbering of a project is carried out via the counter assignment function used to customize the project codification based on whether they belong to a company or a group. This function is used to define specific counters by company and a global counter when the company code has not been entered. A control checks if the maximum length of the sequence number is not greater than the length of the associated data.

Tab General

This tab contains 4 project description fields:

  • The "Identification" section is used to enter a short title, to search the project code and the attachment structure code.
  • The "Definition" section is used to determine the project type, objective, amount, management currency, and to define the planned study and realization periods. Statistical groups are free fields available for reporting requirements, whose description can be customize. There is neither link nor control with the statistical groups generated in the envelopes and no specific management rule.
  • The "Fund provider" section is used to select a BP and to enter the amount financed by this BP. In this version, this data is used for information purposes. There is neither link nor control between the financed amounts and the project amount, neither link with the lot financing method if it is qualified as "loan" or with the lot amount, neither link nor control between the data entered in the project and those entered in the envelope.
  • Section "Forecasts/periods" is used to position expenditure forecasts. These also are information fields used to enter a period (start and end date) and the amount expected for the determined period. There is no control between the forecast sum and the project provisional amount.

Tab Batches

A project can be divided into lots, which are used to give the necessary instructions for the division into budget envelopes or operations. The sum of the lots entered cannot exceed the estimated project amount

Tab Assets

Tab "Assets" is linked to the activation of activity code "GDFAS".

This tab is used to enter without any control the assets to be renewed within the project framework, and for each one of them to indicate:

  • the provisional renewal amount,
  • the corresponding project lot number for the replacement asset.

These assets will have to be processed in provisional issues within the framework of the depreciation load forecast for the coming years.

Tab Office documents

This tab is used to enter or copy a project description from another document by using a WORD, EXCEL or POWER POINT-type document.

The document type is selected upon document creation. When the document is created with a determined type, it is impossible to change the document type without deleting the original document. Thus, a document created with type WORD cannot be transformed into an EXCEL document without deleting the WORD document. If there is a document type change, a message informs the user of the original document deletion.

Error messages

In addition to the generic error messages, the following messages can appear during the entry :

The group, company or site does not exist.

The indicated site does not exist: Modify the entry, or create the site.

The currency of the main analytical ledger of this group is not compatible with the project currency.

This message is displayed in project creation when the project "Currency" code is modified and the entered company/companies are attached to a currency main analytical reference base different from the modified one of the project. Answering OK to this message replaces the entered project currency with the currency of the main analytical reference base.

The currencies of the main analytical ledgers are not compatible throughout the various companies of this group.

Attaching the project to a group containing different currencies is prohibited: the user has to modify the attachment group or update the group so that it only contains companies that have the same currency.

The sum of the amounts by batch exceeds the estimated amount

The user has to modify the lot amount or the estimated project amount.

Incorrect site

This message is displayed in lot site entry mode, when the entered site does not belong to the project sites. Another site code has to be entered or it has to be searched by the selection only showing the authorized sites of the project.

The site does not belong to the sites of the project group

This message is displayed in lot site entry mode, when the entered site does not belong to the project sites. Another site code has to be entered or it has to be searched by the selection only showing the authorized sites of the project.

You will erase the current document if you change the document type. Do you want to continue ?

Warning message displayed when the project has been created with a WORD-type document for instance and when the user chooses a different document type, such as EXCEL or POWER POINT. Answering "Yes" erases the WORD document and the user can create a document of another type; answering "No" is used to keep the original document, which can be modified.

Batch not defined

In lot field entry in tab "Assets", this message indicates that the lot number is not defined in tab "Lot".

The entered company does not have a main site.

Add a main site code to the company or modify the company code.

Problem on recovering the sequence number

This message is displayed if the code of the main sequence number is not entered in the "Sequence numbers assignment".

Tables used

SEEREFERTTO Refer to documentation Implementation