This parameter determines if the Master Production Schedule (MPS) should force the generation of reorder suggestions by project code to cover requirements originating from a planned Sales order (SOP). 

For every transaction, the MPS compares the resulting stock level and the reorder lead time with actual requirements (orders). If the stock level on the date of the planning run (MPS processing (FUNMPS), field Reference date) plus the reorder lead time is too low the MPS can generate a suggestion. The date for the generated suggestion will be the date of the planning run.

'No' - The MPS process must not generate suggestions if the planning run establishes that an existing order covers safety stock for the date of the run plus the reorder lead time.

'Yes' - The MPS process must generate a suggestion by project code to cover requirements originating from a planned Sales order (SOP).

Level of localization/Global variable

This parameter is defined at the level Folder. It belongs to Chapter STO (Inventory) and the Group SCH (Planning), The following parameters are also associated with this chapter and group :

No global variable is associated with it.

Comments

This paramater is only applicable for products managed 'By order'.