Safety stock coverage

This parameter determines if Material Requirements Planning (MRP) should generate suggestions if the planning run establishes that actual requirements will result in stock shortages. 

For every transaction, MRP compares the resulting stock level and the reorder lead time with actual requirements (orders). If the stock level on the date of the planning run (MRP processing (FUNMRP / FUNMRPG), Reference date field) plus the reorder lead time is too low, MRP can generate a suggestion. The suggestion quantity increases the stock level to the specified safety level. The date for the generated suggestion is the date of the planning run.

Yes: The MRP process generates a suggestion to cover the safety stock.

No: The MRP process does not generate suggestions if the planning run establishes that an existing order covers safety stock for the date of the run plus the reorder lead time.

Level of localization/Global variable

This parameter is defined at the level Folder. It belongs to Chapter STO (Inventory) and the Group SCH (Planning), The following parameters are also associated with this chapter and group :

No global variable is associated with it.

Comments

The type of suggestions to be generated (work order, purchase order, intersite transfer, or subcontract order) are defined in the MRP Requirements parameters (Setup > Stock > Requirements parameters (GESPCB)).

The facility to move an existing order forward is also defined in the MRP Requirements parameters (Forward lead time field) for each type of suggestion.