Managing the tracking plans
This function is used to launch the "Managing the tracking plans" function after selection of the work orders with the status: "Firm", "Not suspended", "Pending", "In process" or "Completed".
The accessible actions are:
Prerequisite
Refer to documentation Implementation
Screen management
When a transaction is selected, the management of the tracking plans is done using the buttons at the bottom of the screen.
Entry screen
Filters
| Site (field FCY) |
|
The production site associated with the user is proposed by default. It can be modified by another site authorized for the operator, depending on its authorizations. |
| User (field PLANNER) |
|
Operator in charge of performing the production planning or product ordering. |
| End date (field ENDDATSTR) |
|
This field indicates the selection start date to enter. |
| field ENDDATEND |
|
This field indicates the selection end date to enter. |
Start - end range
| Work order (field WMFGNUMD) |
|
Entering these fields is not mandatory. Use them to limit the display of allocations to one document or a range of documents. |
| field WMFGNUMF |
|
Enter the selection end entry number. |
| Routing (field WROUNUMD) |
|
Enter the selection start routing. |
| field WROUNUMF |
|
Enter the selection end routing. |
| Code (field WROUALTD) |
|
Enter the start selection routing code. |
| field WROUALTF |
|
Enter the end selection routing code. |
| Pick (field PECFLG) |
| Order no. (field MFGNUM) |
|
This field displays the work order number (unique ID). |
| Release mode (field MFGMOD) |
|
This code is used to define the release mode.
Based on the entry transaction used, the partial modes can be of type "to be completed" or "final". |
| Start date (field STRDAT) |
|
This field identifies the 1st day of the period for which the distribution key is defined. |
| End date (field ENDDAT) |
| Tracking flag (field MFGTRKFLG) |
| Priority (field MFGPIO) |
|
Use this field to assign a priority to this work order. |
| Stock unit (field STU) |
|
This field indicates the product management unit in which are expressed:
This information is always displayed, regardless of the transaction used. It cannot be modified. |
| Planned quantity (field EXTQTY) |
|
This field indicates the planned quantity, expressed in sales unit, for this contract product. |
| Remaining quantity (field RMNEXTQTY) |
| Routing (field ROUNUM) |
|
The routing is used to describe the product manufacturing process. |
| Code (field ROUALT) |
|
Multiple routings can be defined for a single product. Each routing code can be assigned specific management features. These include restriction of the routing to a specific site and to specific areas of functionality (for use in a manufacturing environment, for costing or for capacity planning). |
| Allocation status (field ALLSTA) |
| Scheduling status (field SCDFLG) |
| Scheduling mode (field SCDMOD) |
| Work Orders |
| Instantaneous availability |
| Components available on time |
| Allocation |
| Scheduling |
| Work Order Status |
Specific Buttons
|
Search |
|
Criteria |
|
Time |
This button is used to create a time tracking plan. |
|
Manufacturing |
This button is used to create a manufacturing plan. |
|
Consumption |
This button is used to create a material tracking plan. |
|
Reinstatement |
This button is used to create a reintegration plan. |
|
Technical Sheets |
This button is used to create a technical sheet plan. |
|
This button is used to exclude all the available work order lines in the table. |