Use this function to record operator time and progress against individual work orders, routings and work centers. This might be recording productive time and the receipt of produced goods for a specific work order, recording activity against a specific operation in a route, or recording time against a work center, usually non-productive time such as maintenance of a machine.

To record, or track production activity, work orders must be at order status 'Firm' (field Order status (field MFGSTA) in the Home section of the Work orders function (GESMFG)) and materials must be available for tracking unless the parameter Release if shortage (field MFGSHTCOD) in the Manufacturing section of the product-site record is selected.

This function is directly linked with the Non-conformance management functionality. If the manufacturing process warrants notification to your Quality management team of a potential non-conformity you can raise a non-conformance incidence directly from this function. For example, if you are aware of a problem, or failure or potential failure in a design or production model, or in a service, or in a process, or in the system.

Prerequisites

SEEREFERTTO Refer to documentation Implementation

Screen management

This function is customized to the needs of your organization and your processes. The transaction you select determines the way in which you enter information, and how information is displayed and printed.

If only one transaction has been set up you are not offered a choice, the default entry screen is displayed. The Time tracking plan function contains a header information section into which you enter your selection (or filtering) criteria. The operation tracking details will be built from the reference dates you provide. 

Entry screen

Filters

Use this section to filter or select records to be tracked:

  • Site. Entry of the production site is mandatory.
  • Employee ID. Entry of an Employee ID is determined by the selected entry transaction. If defined, each record selected defaults to the entered Employee ID code.
  • Tracking dates. You can record operator time over a range of dates.
  • Global time booked. Cumulative time to be apportioned proportionally over the selected records according to the planned times.

Start-end range

A number of ranges are displayed.

  • To include all applicable operations, leave all the fields blank.
  • To include only selected operations, type in the required ranges. Leave the first field blank to include the lowest value or the second field blank to include the highest value.

You can use the Criteria action to enhance the selection criteria applied.

Operation tracking grid

Use the Operation tracking grid or table to enter production times and quantities for operations in the routing used to produce the manufactured product.

The columns displayed in the grid, the order in which they are displayed, the fields available and those that have automated entry of the tracking information is determined by the selected entry transaction.

The default tracking date is today's date. You can enter an earlier date than today but not a later date. Stock issues and receipts corresponding to any material or production tracking are carried out on the entered date. The system will validate that the date falls in a period for which stock updates are authorized.

The types of tracking available – the recording of time against operations for work orders, against operation activity (routing/product tracking) without a work order and against work centers (work center/miscellaneous tracking) – is determined by the selected entry transaction.

You can record progress or completion data against one or all of the selected operations and add an unplanned operation. Production times are adjusted automatically.

  • The quantity you record in the Total completed quantity (field CPLQTY) field should be the total quantity produced by the operation, including any rejected quantities.
  • If you need to record a rejected quantity for an operation, you can assign individual rejection codes to rejection quantities using a Detail entry action. This action is available from the Actions icon in the Actual rejected qty (field REJCPLQTY) and Reject (field SCANUM1) fields.
  • You can record actual setup and run times for an operation over a range of dates and times. An Entry by range action is available from the Actions icon in the Actual setup time (field CPLSETTIM) and Actual run time (field CPLOPETIM) fields. The times are calculated from the entered values.

If this tracking includes progress reporting against the produced goods, the actual quantities are updated from the progress recorded against the selected operations.
 You must adjust the actual quantity of the produced goods if an operation includes a rejected quantity as the total completed quantity of the produced goods reflects the quantity recorded in the Total completed quantity (see above).

If this tracking includes reporting the issue of materials to the work order, the tracked quantities are updated from the progress recorded against the linked operations.

 The Time type provides a useful reference as this function permits progress to be recorded against an operation without a work order.

If this operation tracking is for a scheduled work order, the production load is updated when the tracking is generated.

If the selected entry transaction requires manual confirmation of produced goods quantities or material issues, a Produced goods and/or Material consumption action respectively is available from the icon on each applicable line in the grid. These actions open the appropriate workbench/plan for recording these details. These actions are not available if stock receipts and issues are automated (as determined by the selected entry transaction).

Specific actions

Limitations

  • An incidence of non-conformance can only be raised (reported) from an operation tracking line where the Time type (field TIMTYP) is set to 'Work order'.

  • The user parameter NCSDOCCRE-Non-conformance creation mode (TC module, NCS group) is not recognized by this function. A non-conformance incident raised from an operation tracking line will be raised in 'basic' mode. The non-conformance will be raised at status 'New' with default values and details from the operation tracking line.

Error messages

In addition to the generic error messages, the following messages can appear during the entry :

The messages that arise from the manual tracking of materials or the manual production reporting are listed in the corresponding documentation (Material tracking plan, Production plan).

A material is out of stock and prevents the tracking of this WO (XXXXX)

This message is displayed when creating the tracking for a work order where a material is out of stock, the Release if shortage setup is set to 'No' in the product-site record and the MTKALLMGT general setup Mandatory allocation to the WO is set to 'Yes'.

It is only possible to track a WO with status "FIRM"

This message is displayed if the status of the work order is not set to 'Firm'.

Incomplete allocation. Tracking impossible

This message is displayed if the work order is not at a minimum allocated globally and the MKTALLMGT general setup, Mandatory allocation to the WO, is set to 'Yes'.

The WO is not printed: Tracking impossible

This message is displayed if the production folder has not been printed and this is mandatory for production to start (according to the DOSFAB general setup).

Incomplete Work Order: Tracking impossible

This message is displayed if the work order is not complete (only materials or only operations) and the WO management plans to complete this order before releasing the production.

Previous operation not tracked: operation 999

This message is displayed when an attempt is made to track an operation even though the previous operation has not been tracked. This message can be blocking or not according to the value of the CTLOPEPRE general setup. This message only concerns trackings of type "WO".

Technical sheet not entered

This message is displayed upon tracking creation (as a function of the value of general setup CTLFICTEC) and if an operation with a technical sheet has been tracked and that the technical sheet has not been entered.

Sub-contracting prohibited

This message is displayed when adding a non-planned operation of the sub-contractor type (entry of a standard sub-contractor operation or an actual work centre of the type sub-contractor).

Actual quantity greater than the planned quantity. Continue?

This warning message is displayed during the tracking of an operation if the actual quantity is greater than the planned quantity.

Rejected quantity greater than the actual quantity

This message is displayed during operation tracking if the rejected quantity is greater than the actual quantity.

Recover the standard operation data?

This message is displayed during the addition of a non-planned operation based on a standard operation.

The labor work center must not be identical to the principal work center

This message is displayed during the manual tracking of an operation if the actual labour work centre is identical to the actual principal work centre.

XXXXXX is not a labor work center

This message can be displayed following the validation control on the actual labour work centre.

The site attached to the work center must be the same as the site linked to the routing code

This message can be displayed following the validity control on the actual machine or labour work centre.

Modifying work center of a versioned routing operation

This warning is displayed if this work order uses a routing that is version-managed and you have chosen to modify an existing operation. Click Cancel to abandon your action. To modify the work center, click OK. You will not be prevented from modifying the operation if you need to.

There is an incoherence between the routing and BOM codes!

This message is displayed during the validation of the BOM code in the case of a 'Product'-type tracking.

Tracking unexpected material on a versioned product

This warning is displayed if this work order is for a product (BOM) that is version-managed and you have chosen to add a new component to it. Click Cancel to abandon your action. To add the new component, click OK. You will not be prevented from adding the component if you need to.

You have already carried out the material tracking for this operation!

Information message if a second attempt is made to manually track the materials linked to an operation.

You have already carried out the production reporting for this operation !

Information message if a second attempt is made to manually report the production of products linked to an operation.

Tracking unexpected operation on a versioned routing

This warning is displayed if this work order uses a routing that is version-managed and you have chosen to add a new operation to it. Click Cancel to abandon your action. To add the new operation, click OK. You will not be prevented from adding the operation if you need to.

Operation already present in line 999

This message is displayed if an attempt is made to add an operation that already exists on another line.

Excluded line

Work center does not exist for this site.

Operation not tracked

This message is displayed if an attempt is made to track an operation for which the tracking stage field (no, normal, range) is set to no.

Tables used

SEEREFERTTO Refer to documentation Implementation