Provisional Cost Inquiry
Prerequisite
Refer to documentation Implementation
Screen management
The inquiry screen displays for each cost group the provisional production cost price for this WO as well as the calculation setups being used. It makes it possible to view the theoretical provisional cost or the provisional cost upon release.
Header
The header is used to enter the selection criteria.
Product (field ITMREF) |
Reference of the manufactured/sub-contracted product which cost price needs to be calculated. |
Stock site (field STOFCY) |
Use this field to define the storage and/or production site. The site defined on the user record is displayed by default but can be amended.
|
Year (field YEA) |
Currency (field CUR) |
field VCRNUM |
Work order/sub-contract order numbers used to select a cost price. |
Line no. (field VCRLIN) |
Major version (field ECCVALMAJ) |
Minor version (field ECCVALMIN) |
Order status (field MFGSTA) |
Project (field PJT) |
Product category (field TCLCOD) |
Product status (field ITMSTA) |
Cost group (field BRDCOD) |
Date calculated (field MFCDAT) |
Overhead (field OVECOD) |
Ratio (%) (field CPLRIO) |
Calculation quantity (field QTYSTU) |
field STU0 |
Planned quantity (field EXTQTY) |
field STU1 |
Actual quantity (field CPLQTY) |
field STU2 |
Tab Production Cost price Inquiry
This tab presents the different cost components of the subcontract order as well as the setups used for its calculation.
it also displays a graphical representation showing the production cost price breakdown by cost type.
Block number 1
Material (field MATTOT) |
Component (field MATLEV0) |
This field contains the value linked to the material directly associated to the nomenclature first level of the product. |
Machine (field MACTOT) |
Labor (field LABTOT) |
Subcontract (field SCOTOT) |
This field displays the subcontract service cost. The price used to value the service is specified by the VLTSCEOEXT - Service value price/planned PC parameter (ACH chapter, COS group). |
Overhead (field OVETOT) |
Total without overhead (field CSTTOT) |
Total cost (field TOTWITOVE) |
Detail (field MFCDET) |
Grid Graph
Description (field LBL) |
field CST |
Display graph
Family detail (field DETFLG) |
Material (field MATFLG) |
Machine (field MACFLG) |
Labor (field LABFLG) |
Subcontract (field SCOFLG) |
Overhead (field OVEFLG) |
Total (field TOTFLG) |
Tab Multi-level
Block number 1
Material (field MATTOT) |
Machine (field MACTOT) |
Labor (field LABTOT) |
Subcontract (field SCOTOT) |
Overhead (field OVETOT) |
Total without overhead (field CSTTOT) |
Total with overhead (field TOTWITOVE) |
Detail (field MFCDET) |
Grid Graph
Description (field LBL) |
field CST |
Display graph
Family detail (field DETFLG) |
Material (field MATFLG) |
Machine (field MACFLG) |
Labor (field LABFLG) |
Subcontract (field SCOFLG) |
Overhead (field OVEFLG) |
Total (field TOTFLG) |
Tab Setup definition
Calculation setup
BOM code (field BOMALT) |
Routing code (field ROUALT) |
Material (field SLTMATCST) |
Semifinished (field SLTSEMCST) |
Dimension rate (field VLTCCERAT) |
Overhead column (field SLTOVECOL) |
Specific Buttons
Archived |
Used to view the detail of the production cost price by sub-groups. |
History |
Used to consult the History of the production cost prices. |